My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement
>
Meetings
>
2025
>
06. June
>
2025-06-03 10:00 AM - Commissioners' Agenda
>
Professional Services Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 3:40:43 PM
Creation date
6/5/2025 3:40:28 PM
Metadata
Fields
Template:
Meeting
Date
6/3/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Professional Service Agreement with Tenelco Inc. for Land Application Services
Order
2
Placement
Consent Agenda
Row ID
131556
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF WASHINGTON <br />DEPARTMENT OF ECOLOGY <br />1250 W. Aldcr Streer o Union Gap, WA 9(9903-0009 : (509) 575'2490 <br />May 20,2025 <br />Patti Stacey <br />Kittitas County Solid Waste <br />Ellensburg WA 98926-2886 <br />SubJect: Approval of Septage Land Apptication Due to Lngoons Near Capacity <br />Dear Ms, Stacey: <br />This letter serves as formal approval of yow request submitted on May 19,2025 for emergency <br />septage land applications at the Ryegrass septage permitted sitm, due to your septage lagoons <br />reaching a near capacity condition. The approval is granted based on the site specific land <br />application plan dated April 2025 and in accordance with til/AC 173-308-270, sepkge land <br />applied to the land. <br />Approval Summnry <br />o Site Location: sites D-A and D-B, with existing active 2024 ,'inter seeded winter wheat <br />seedlings, and recently added new sites E-A. E-8, and E-C, wittr the active mixture of <br />native vegetation growing (Site Map attached). <br />o Approved Application Area: Sites D-A (6.2 aqes) and D-B (6.2 acres), Sites E-A (7.0 <br />acres). E-B (4.8 acres), and E-C (5.7 acres). <br />. Application Window: As soon as possible. <br />. Application Frequency: Single event. <br />Approved Agronomic Rates <br />Based on soil test results of sites dated IVIay 9,2025, and microgeon needs of winter wheat (81 <br />lbs N/acre/year, with an estimated target grain yield of 30 bushels/acre) (source, WSU extension <br />publication), and 39.5 lbs N/acrelyear of ttre mixture of the native vegetation (source, a local
The URL can be used to link to this page
Your browser does not support the video tag.