Laserfiche WebLink
Kittitas County Sotid Waste <br />925 lndustriat Way <br />Etlensburg, WA 98926 <br />March 24,2025 <br />Belsaas and Smith Construction <br />103 East 4th Avenue, Suite 209 <br />E[lensburg, WA 98926 <br />Project: Lower Va[[ey Transfer, Change Order No. 5 <br />Mr. Nelson, <br />I am writingto formatty acknowtedge and award change order number 5, addressing partial <br />acceptance of Change Order Proposa[ (COP) #09, for the increase of the tipping fl.oor height and <br />addition of retaining watts. <br />Approved ltems: <br />. lnside Tunnel Footings - $7,290.00 <br />e Stair Footing Reduction - <$23,400.00> <br />o Outside Tunnet Wal.l. Reduciion - <$80,680.00> <br />o Tunnel Wat[ to Bottom of SLab - $31,150.00 <br />. Piers lncrease Height - $6,380.00 <br />o Boltards - $9,000.00 <br />o Retaining Watt Footings - $63,700.00 <br />o Added Exterior4'Wat[-$gS,geO.OO <br />o Exterior RetainingWatts - $91,040.00 <br />o Cotd Weather Protection - $17,600.00 <br />. Concrete Sidewatk- $816.00 <br />o Exterior Concrete Curb -$21 ,22O.O0 <br />o AdditionatRebar-$25,576.00 <br />The approved subtotatforthese items is$204,072.00. Overhead, profit, and bondingcostsforthis <br />approved scope have been calculated proportional,ty to the accepted work. <br />Subtotat of changes <br />Overhead 3% <br />Profit 10% <br />Bonding 1.5% <br />TOTAL <br />$204,072.00 <br />$ 6,722.76 <br />$ 20,407.20 <br />$ 3.061.08 <br />$299,662.M