My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
04. April
>
2025-04-15 10:00 AM - Commissioners' Agenda
>
2025-03-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:36:45 PM
Creation date
4/10/2025 12:15:43 PM
Metadata
Fields
Template:
Meeting
Date
4/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
129782
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ryegrass LPL and Ryegrass Balefill Landfill Upgradient Groundwater <br />Investigation <br />Kittitas County Solid Waste <br />Contents <br />LIntroduction....................................................................................................................................1 <br />2. Background.........................................................................................................................................1 <br />2.1 Facility Description......................................................................................................................1 <br />2.2 Site History ...................................................................................................................................1 <br />2.2.1 Ryegrass Balefill Landfill..............................................................................................1 <br />2.2.2 Ryegrass Limited Purpose Landfill...............................................................................2 <br />2.2.3 Other Facility Operations..............................................................................................2 <br />3. Hydrogeology .......................................................................................................................................3 <br />3.1 Geologic Setting...........................................................................................................................3 <br />3.2 Groundwater Monitoring History .................................................................................................3 <br />3.2.1 Water Quality Evaluations.............................................................................................4 <br />3.3 Upgradient Source Evaluation....................................................................................................4 <br />3.4 Shallow Aquifer Details...............................................................................................................4 <br />3.5 Groundwater Gradient.................................................................................................................5 <br />3.6 Groundwater Flow Velocity..........................................................................................................5 <br />3.6.1 Evidence of Upgradient Sources..................................................................................5 <br />3.7 Cross Sections.............................................................................................................................5 <br />3.7.1 Top of the Vantage Interbed.........................................................................................6 <br />4. Drilling, Construction, and Testing.....................................................................................................6 <br />4.1 Drilling..........................................................................................................................................6 <br />4.2 Construction.................................................................................................................................6 <br />4.3 Well Development & Testing.......................................................................................................7 <br />4.3.1 Well Development.........................................................................................................7 <br />4.3.2 Pump Placement...........................................................................................................7 <br />4.3.3 Short -Term Pumping Test.............................................................................................7 <br />4.3.4 Well Survey....................................................................................................................7 <br />4.4 Investigative Derived Waste........................................................................................................8 <br />4.5 Hydraulic Testing.........................................................................................................................8 <br />4.5.1 Transducers...................................................................................................................8 <br />4.5.2 Manual Measurements................................................................................................8 <br />4.5.3 Testing procedures.......................................................................................................8 <br />4.5.4 Hydrogeologic Analysis.................................................................................................8 <br />April 2024 1553-1763-010 i <br />Revised May 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.