Laserfiche WebLink
Monitoring Well B8 Plans and Specifications <br />Kittitas County Solid Waste <br />Contents <br />1.1 <br />Definitions....................................................................................................................................1 <br />1.2 <br />Scope of Work..............................................................................................................................1 <br />1.2.1 Project Description........................................................................................................1 <br />1.2.2 Items included in the Work...........................................................................................2 <br />1.2.3 Plan Sheets...................................................................................................................2 <br />1.3 <br />Schedule......................................................................................................................................2 <br />1.4 <br />Pre -Work Submittals....................................................................................................................3 <br />1.4.1 Schedule, Materials, and Contacts..............................................................................3 <br />1.4.2 Health and Safety Plan.................................................................................................3 <br />1.4.3 Standard Spill Prevention Control and Countermeasure Plan...................................5 <br />1.4.4 Notice Of Intent/ One Call Utility Notification.............................................................6 <br />1.5 <br />Post -Work Submittals..................................................................................................................6 <br />1.6 <br />Miscellaneous..............................................................................................................................6 <br />2. Drilling and Well Construc#ion............................................................................................................7 <br />2.1 General Requirements................................................................................................................7 <br />2.1.1 <br />Site Preparation............................................................................................................ <br />7 <br />2.1.2 <br />Trimming and Cleanup.................................................................................................7 <br />2.1.3 <br />Site Restoration.............................................................................................................7 <br />2.1.4 <br />Well Site.........................................................................................................................8 <br />2.1.5 <br />Well Construction Records...........................................................................................8 <br />2.1.6 <br />Soil Samples..................................................................................................................8 <br />2.1.7 <br />Waste Soil / Refuse / Cuttings.....................................................................................8 <br />2.2 New Well Drilling..........................................................................................................................8 <br />2.2.1 <br />Drilling............................................................................................................................9 <br />2.2.2 <br />Decontamination Procedures................................................................................... <br />10 <br />2.2.3 <br />Borehole Logging....................................................................................................... <br />10 <br />2.2.4 <br />Alignment....................................................................................................................10 <br />2.2.5 <br />Abandonment.............................................................................................................10 <br />2.2.6 <br />Determining Appropriate Drilling Depth................................................................... <br />10 <br />2.2.7 <br />Testing During Drilling................................................................................................ <br />11 <br />2.2.8 <br />Standby Time.............................................................................................................. <br />11 <br />February 2025 1553-1763-010 i <br />