My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
04. April
>
2025-04-15 10:00 AM - Commissioners' Agenda
>
2025-03-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:36:45 PM
Creation date
4/10/2025 12:15:43 PM
Metadata
Fields
Template:
Meeting
Date
4/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
129782
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well B8 Plans and Specifications <br />Kittitas County Solid Waste <br />Contents <br />1.1 <br />Definitions....................................................................................................................................1 <br />1.2 <br />Scope of Work..............................................................................................................................1 <br />1.2.1 Project Description........................................................................................................1 <br />1.2.2 Items included in the Work...........................................................................................2 <br />1.2.3 Plan Sheets...................................................................................................................2 <br />1.3 <br />Schedule......................................................................................................................................2 <br />1.4 <br />Pre -Work Submittals....................................................................................................................3 <br />1.4.1 Schedule, Materials, and Contacts..............................................................................3 <br />1.4.2 Health and Safety Plan.................................................................................................3 <br />1.4.3 Standard Spill Prevention Control and Countermeasure Plan...................................5 <br />1.4.4 Notice Of Intent/ One Call Utility Notification.............................................................6 <br />1.5 <br />Post -Work Submittals..................................................................................................................6 <br />1.6 <br />Miscellaneous..............................................................................................................................6 <br />2. Drilling and Well Construc#ion............................................................................................................7 <br />2.1 General Requirements................................................................................................................7 <br />2.1.1 <br />Site Preparation............................................................................................................ <br />7 <br />2.1.2 <br />Trimming and Cleanup.................................................................................................7 <br />2.1.3 <br />Site Restoration.............................................................................................................7 <br />2.1.4 <br />Well Site.........................................................................................................................8 <br />2.1.5 <br />Well Construction Records...........................................................................................8 <br />2.1.6 <br />Soil Samples..................................................................................................................8 <br />2.1.7 <br />Waste Soil / Refuse / Cuttings.....................................................................................8 <br />2.2 New Well Drilling..........................................................................................................................8 <br />2.2.1 <br />Drilling............................................................................................................................9 <br />2.2.2 <br />Decontamination Procedures................................................................................... <br />10 <br />2.2.3 <br />Borehole Logging....................................................................................................... <br />10 <br />2.2.4 <br />Alignment....................................................................................................................10 <br />2.2.5 <br />Abandonment.............................................................................................................10 <br />2.2.6 <br />Determining Appropriate Drilling Depth................................................................... <br />10 <br />2.2.7 <br />Testing During Drilling................................................................................................ <br />11 <br />2.2.8 <br />Standby Time.............................................................................................................. <br />11 <br />February 2025 1553-1763-010 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.