My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-11-minutes-solid-waste-and-maintenance
>
Meetings
>
2025
>
04. April
>
2025-04-15 10:00 AM - Commissioners' Agenda
>
2025-03-11-minutes-solid-waste-and-maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:36:45 PM
Creation date
4/10/2025 12:15:43 PM
Metadata
Fields
Template:
Meeting
Date
4/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
129782
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "B" <br />COMPENSATION <br />As full compensation for satisfactory performance of the work, the County shall pay <br />Contractor compensation not to exceed: <br />Schedule of Unit Prices Measurement and Payment shall be as follows: <br />1. "Mobilization/Demobilization" by the lump sum unit price. This includes all costs for <br />transportation of equipment and personnel; hotels, per diem, and meals forstaff; and fuel <br />for the entire duration of the project. 2.3. 4.5. 6.7. 8.9. $ 47 450.00 <br />2. "Department of Ecology Notice of Intent / Well Log,"by the lump sum unit price <br />following chapter 173-160 WAC. $ 250.00 <br />3. "Set Up / Decontamination" by the lump sum unit price. $ 2,560.00 <br />4. "Drill minimum 6.375-inch diameter sonic borehole"by the unit price per linear vertical <br />foot drilled. This unit price applies to all drilling below ground surface except in <br />instances of abandonment bythe contractor. $ 250.00 <br />5. "Backfill unused6.375-inchborehole"bytheunitpriceper <br />linearverticalfoot.Thisunitprice appliestoall backfill prior to installation of the sand <br />pack underlying the well screen. <br />$100.00 <br />6. "Construct 2-inch diameter Well" by the unit price per linear vertical foot. This unit price <br />applies to all well construction where the well screen and riser pipe are installed <br />(includes footage above land surface into the monument) the sand pack underlying <br />the well screen, and the seal placed above the sand pack. $ 62.00 <br />7. "Construct minimum 6-inch diameter above ground well monument with bollards"by the <br />lump sum unit price as specified. This lump sum price includes all labor, materials, and <br />equipment for installation of the well monument and bollards. $ 2,500.00 <br />8. "Well development" by the lump sum unit price. This price shall include all labor, <br />materials, and equipment necessary to develop the completed well per the provided <br />specifications. <br />$ 3,500.00 <br />9. "Standby Time" by the unit price per hour. The hourly rate will be billed on standby <br />Professional Services Agreement (rev. 09/24/2018) <br />Page 15 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.