Laserfiche WebLink
DRILLING COMPANY; Hot Drilling <br />LOCATION: <br />DRILLING METHOD' Air Rotary <br />DATE STAATED: 62tR000 <br />SAMPLING METHOD: Grab (cuttings) <br />DATE COMPLETED, 621f2000 <br />SURFACE ELEVATION. 2550 t feel <br />LOGGED BY: S. Zorn <br />Z <br />CrU <br />Q <br />you'. <br />2E <br />� <br />c <br />1`-LU <br />w <br />g <br />F- <br />Z <br />F- <br />O 4 <br />rN� <br />4 <br />Q. <br />z # <br />LLI <br />_ <br />3 �w <br />0- <br />it. (J <br />ul j DESCRIPTION <br />5 <br />a s <br />O <br />O w <br />a U NOTES <br />O <br />0 <br />0 <br />o to 1 tool_ TOPSOIL. Ian_ sand and sil <br />1 10 5 feet: WEATHERED BASALT. Gray to tan, fractured <br />and coaled With tan silt. (GINKGO FLOW) <br />-- <br />5 <br />5 <br />_ _ <br />5 to 30 feet: FRACTURED BASALT. Gray, dense, some <br />p <br />fractures filled with little clay or iron stains. (GINKGO <br />p <br />FLOM <br />10 I <br />1 10- <br />15 I <br />20 I <br />1 20 - <br />MONITORING WELL: <br />G Ryegrass Baleff(I B'6 <br />Kittitas, Washington PAGE: 1 of 2 <br />liMGEOSCIENCES INC <br />t, ) PROJECT NO.: 98098 700 FIGURE: <br />(U� J MWELL 98098AGPJ 4r25ffi1 <br />