My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-03-24-minutes-ec-study-session
>
Meetings
>
2025
>
04. April
>
2025-04-15 10:00 AM - Commissioners' Agenda
>
2025-03-24-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 12:22:16 PM
Creation date
4/10/2025 12:15:43 PM
Metadata
Fields
Template:
Meeting
Date
4/15/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
129782
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Temporary Project Specialist Position Proposal <br />CURRENT STATUS <br />Currently, no dedicated position exists for addressing the specialized maintenance and improvement needs of our <br />facilities. Previous efforts to fill a full-time carpenter -type maintenance role were unsuccessful, primarily due to <br />challenges in identifying a candidate with the right skill set and the fact that the workload does not justify a full-time <br />position. <br />CANDIDATE CONSIDERATIONS <br />Our facility encompasses aging structures and infrastructure that require both traditional and specialized <br />maintenance skills. The ideal candidate would bring a combination of experience, craftsmanship, and a willingness <br />to work collaboratively to ensure the sustainable preservation and functionality of our grounds. <br />PROPOSAL <br />We propose hiring a Temporary Project Specialist to support key facility maintenance and improvement efforts. <br />• The candidate would be brought on temporarily, not exceeding 30 working days per fiscal year, to maintain <br />temporary employment status. <br />■ Start date would be coordinated for optimal project timing and efficiency. <br />■ This flexible, project -based approach allows us to strategically address critical needs without the cost or <br />commitment of a full-time role. <br />BENEFITS <br />Cost Savings <br />Ac it ctanric nrnei tha fair rnct of a nrniort specialist for would be: <br />POSITION <br />WAGE <br />VIRPROX. TOTAL PAY (160-240 hrs) <br />Project Specialist <br />$64.00/hour <br />10,240 - $15,360 <br />In comparison, outsourcing the same work to a private contractor at $120—$160/hour would result in dramatically <br />higher labor costs, consuming up to two-thirds of most project budgets. By hiring internally: <br />■ We save approximately $56—$96/hour on labor, enabling more funds to be allocated toward materials and <br />project enhancements. <br />• This budget -friendly approach stretches limited resources further, delivering greater impact per dollar <br />spent. <br />Reduced Risk <br />Having a consistent and known specialist on -site minimizes liability and project risks commonly associated with <br />contracted work. It also ensures better quality control and continuity throughout each project. <br />Strategic Staffing Support <br />This role will provide valuable hands-on support to the KVEC Director and Fair Board, helping to: <br />• Address recurring preventative maintenance challenges. <br />• Assist with planning for future repair and facility needs. <br />• Support implementation of the Capital Improvement Plan, if approved. <br />FUTURE <br />We recommend that this position be considered as a recurring annual option, authorized at the discretion of the <br />Event Center Director and contingent upon budget availability. This will provide ongoing flexibility to respond to <br />infrastructure needs in a cost-effective, proactive manner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.