My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signed Contract
>
Meetings
>
2025
>
03. March
>
2025-03-18 10:00 AM - Commissioners' Agenda
>
Signed Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 11:16:35 AM
Creation date
4/10/2025 11:16:11 AM
Metadata
Fields
Template:
Meeting
Date
3/18/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Awarding a Contract for the Jail Renovation Task 1 Jail TI project and to Authorize the Chair to Execute Documents
Order
10
Placement
Consent Agenda
Row ID
128957
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Submittal and review of shop drawings and prodPct data <br />o Scheduling and seguencine ofwork <br />o Procurement and ordering of materials <br />o Mobilization and site oreparation activities not requirine access to the site <br />2. The Owner has verified that all necessarv materials. equipment. and supplies are either stored on-site or in <br />an approved off-site storage location. ready for deplovment. <br />3. The Owner has issued a Notice to Commence Work. confirmine that the site is accessible for construction <br />activities. <br />L3.2.3 No physical work shall commence on the Proiect Site until the Notice to Commence Work has been issued <br />by the Owner. The Contractor shall not be entitled to delay claims for the period between the Notice to Proceed and <br />the Notice to Commence Work. provided that the Owner does not unreasonably withhold or delay the issuance of the <br />latter. <br />$ 3.2.4 For pumoses of calculating Substantial Completion and Final Completion. the Contract Time shall be <br />measured from the Date of Commencement of the Work" as defined in Section 3.2.2. <br />PAGE 3 <br />txl Not later than three hundred sixtv five ( 365 ) calendar days from the date of commencement of the <br />Work. <br />$ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the <br />Contract. The Contract Sum shall be Two Million Four Hundred Fifty-Seven Thousand Dollars ($ 2"457.000.00 ), <br />subject to additions and deductions as provided in the Contract Documents. <br />Alternate BidNo. I Five Hundred Ninety Eight Thousand Dollars ($598.000.00) <br />PAGE 4 <br />Concrete Repair <br />Epoxy Iqiection Crack Renair <br />Square Foot <br />Lineal Foot <br />$ 130.00 <br />s94.00 <br />9500 per calendar day if the Contractor fails to achieve Substantial Completion as provided in Section 3.3 herein. <br />Not Available <br />$ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 15th day of a month, <br />the Owner shall make payment of the amount certified to the Contractor not later than the last day of the following <br />month. If an Application for Payment is received by the Architect after the application date fixed above, payment of <br />the amount certified shall be made by the Owner not later than Sixtv ( 60 ) days after the Architect receives the <br />Application for Payment. <br />PAGE 5 <br />Five Percent (5%) <br />PAGE 6 <br />Additionsand Deletions ReportforAlADocumentAl0l -2017. Copyright@1915,'1918,1925,1937, 1951,1958,'1961,1963, 1967,'1974,1977,1987, 1991' 1997' <br />trademarks of The American lnstitute of Architects. This document was produced al 12.04:12 ET on 0311412025 under Order No.31 04240097 which expires on <br />OGlgOt2O2s, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents@ Terms of Service. To report <br />copyright violations, e-mail docinfo@aiacontracts.com. <br />Uier Notes: - (1716022339) <br />2
The URL can be used to link to this page
Your browser does not support the video tag.