My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-065 (2)
>
Meetings
>
2025
>
03. March
>
2025-03-18 10:00 AM - Commissioners' Agenda
>
Resolution 2025-065 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:38:31 PM
Creation date
3/21/2025 1:38:24 PM
Metadata
Fields
Template:
Meeting
Date
3/18/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution for the 2025 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the Town of South Cle Elum
Order
13
Placement
Consent Agenda
Row ID
128957
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.16 kepare 30,06 prellminary o_prnion of oonstruc{on cogts. perform inbmal eA/ec and provide <br />30% pretimlnary opinion of construction oosts to Tovr/t-l for rwiew. <br />3.17 Attend one (1) ln-person rneeting with TOWN to revianr 30% submittal package. <br />Phase.3.0 D€tlverabbs: <br />4. ^U-utlty <br />Con$e.Uoq hctt{l1g lnfonnatbn recetsed ftom utitity companiesB. Lleellrry mhutes ftom u0llty coodlnadon meetingsc. 3006 subfittel package iniluoirg prellmin*y ceEtgn plane and oplnlon of construction <br />coctB <br />4.0 , ,Flnal Deslo.n. Phns. and.lgpsclfl*otbns {F0.6,002o. and Fhatt <br />Due to potentlal construction fundlng reslrainb, lt is antidpated up to ttvo (2) separate bH paokagesmay bc prepared. <br />4.1 F$lodng. tecelpt of 30% submitlal peck4e cornments ftom ths Tovt ll, prepare 60% deelgnplam and ophlon of consbr.ctbn oism. - <br />4.2 Nstiil private u0lity co|npanftls of pendlng Fnprovennnts, sohedub, and updates to oontract <br />flans between erch submissbn of plans-anO specilica0ons. <br />4.3 Coordtnato planswlth tdofltm€d prtuab uilltues. <br />4-4 Flctone {1)FintuUllty coordination rneetng wlth al pdvab uffililes pdorto6006 submf[€|. <br />4.6 Create and dbbbute meedng mlnutes lo TOVvhl and uullscs fiom roht @ontkrafron m6eting. <br />4'6 Perbrm lntsrulOA/QC and provHe 60flo dcslgn phns 6rd opinirn of cqrshrction cosb toTOVrnlforrwlew. <br />4.7 <br />4.8 <br />Aficnd one (1) nneting $rih roufi.t to review 60% subnt'ilat package. <br />Followlttg receptof 60%.submittal prck4ecommenb fiosn theTolrlN, pfiepere g0% deslgnplans, specilbafonq and opinion oionsfuAion ooab. <br />lbot one (1) Joht uttity mordinaUon meeting with a[ prive uflffites $or to O0% submittal. <br />4'10 Create and ftFbnte m€ung minutes to TOWI and prtvat€ utilfrss fonr joint coordlnetlon <br />mee0ry. <br />4-11 Perbrm lnlerml.QA/_QG,!1{ provue 90% decign plans, specifrcdons and optnbn ofconsfudbn cost to TOIill,l br rcview. <br />4.12 Afrord one (1) meeUng rrvith TOtlN to ra,}ely g0% submi[at pacfqe, <br />4.tA Fdlovlng recapl of 9O%.submlttal pad€g6 comnpnb tlonr lhe TOWN, prepsra find deslgnplem, epeclllcatbno, and oplnbn oioon*ucnon oosts. <br />4.t4 Petbrm lntEnnlOA/OCand provHe final deslgn plan, opectloatlons, and opinbn of <br />consbuolhn cosb to TOVr/il|for rcvlew. <br />4.1 5 Assht To\ N rettfi.seourlng flqqlal of govemrnenbt authodths with juBdie,$on over designcdtsia appltcabte b frre PROJECT. <br />Phase 4.0 OeltueraHes; <br />A ftleoling miruleE tromJofurt coordlnation mEeting wlth pdvate uSFUes, and TOW]I u$ities <br />G:Soilrds & Tst ()ll&Etsotot Cle Elmuoa6tTfl/nurlde tthar M&t Rrpl|csnmfaoaGfi.r6 20tBeE T.3k Ods t|o zo2tot Towrwlde li,rftrilhhturhcnruni.trcr Fige g die <br />4.9
The URL can be used to link to this page
Your browser does not support the video tag.