My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Packet 3.24.25
>
Meetings
>
2025
>
03. March
>
2025-03-24 1:30 PM - Public Works Study Session
>
Final Packet 3.24.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 2:23:46 PM
Creation date
3/20/2025 2:12:40 PM
Metadata
Fields
Template:
Meeting
Date
3/24/2025
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fish Passage Certification <br />WAC 136-150-023 <br />Kittitas <br />2024 <br />Fish Passage Barrier Removal Projects <br />Project Name Total Project Cost Cost Outside of ROW % of Total Cost <br />(25% Allowed by WAC) <br />Total Expenditures for Fish Passage Barrier Removal Outside County Rights -of -Way - <br />Total Annual Road Construction Budget: <br />x 0.005 <br />1/2% of Total Annual Road (Limit of "Outside of Right -of -Way" expense) $0.00 <br />Total Expenditure for Fish Passage Barrier Removal Outside County Right -of -Way $0.00 <br />RCW 36.79.140 provides that only those counties that during the preceding twelve months have spent all revenues collected for road <br />purposes only for such purposes, including removal of barriers to fish passage and accompanying streambed and stream bank repair <br />as specified and limited by RCW 36.82.070, as are allowed by Article II, Section 40 of the Washington State Constitution, are <br />eligible to receive funds from the Rural Arterial Trust Account. <br />
The URL can be used to link to this page
Your browser does not support the video tag.