My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Final Packet 3.24.25
>
Meetings
>
2025
>
03. March
>
2025-03-24 1:30 PM - Public Works Study Session
>
Final Packet 3.24.25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 2:23:46 PM
Creation date
3/20/2025 2:12:40 PM
Metadata
Fields
Template:
Meeting
Date
3/24/2025
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General <br />1 During the reporting year the County Engineer performed the duties and had the responsibilities specified in RCW 36.80.030 Yes <br />Explanation: <br />2 At any time during the reporting year was there a vacancy/change in the position of County Engineer? If so, were the Yes <br />procedures in WAC 136-12 followed? <br />Explanation: WAC 136-12 was followed for the change in position of County Engineer <br />3 The processing of County Road Accident Reports during the reporting year complied with WAC 136-28 Yes <br />Explanation: <br />4 Priority Programming techniques were applied to the ranking of all potential projects on the arterial road system in the Yes <br />reporting year per WAC 136-14-020. <br />Explanation: <br />5 Projects to which expenditures were charged were all on the originally adopted Annual Construction Program of the reporting Yes <br />year and expenditures for maintenance and road equipment purchases and planned major repairs were consistant with <br />originally adopted Annual Road Program or as amended per WAC 136-16-042 <br />Explanation: <br />6 Attached Amendments <br />7 The county's construction by county forces limit for the reporting year computed by CRAB in accordance with RCW $1,266,928.75 <br />36.77.065 <br />8 The actual expenditure for construction by county forces as reported in the reporting year Annual Construction Report $64,668.00 <br />9 Date of which a written Bridge and Inspection Report for the reporting year was furnished to the Legislative Authority as 2025-02-24 <br />required by WAC 136-20-060 <br />10 Uploaded Engineer's Stamped Cover/Title Page for the Bridge and Inspection Report Bridge Report Cover 5heet.pdf <br />Policies and Documents <br />Policy <br />Re: Organization <br />Re: Complaint Handling <br />Re: Work for Others <br />Re: County Road Standards <br />Survey Monument Preservation <br />Priority Programming <br />ER & R Policy <br />ER & R Policy (Adopted <br />Records) <br />WAC Date of Current <br />Version <br />WAC 136-50-050(1) <br />No <br />WAC 136-50-050(2) <br />No <br />WAC 136-50-050(3) <br />No <br />WAC 136-50-050(4) <br />No <br />WAC 136-50-050(5) <br />No <br />WAC 136-14-030 <br />No <br />WAC 136-600-070 <br />No <br />WAC 136-600-070 N/A <br />Uploaded <br />Resolution <br />2020-11-03 <br />2020-03-23 <br />2020-04-07 <br />2023-12-19 <br />2023-03-07 <br />2023-04-18 <br />2023-04-18 <br />N/A 10 2023-231-resolution.pdf <br />
The URL can be used to link to this page
Your browser does not support the video tag.