My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-056
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
Resolution 2025-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:20:03 PM
Creation date
3/17/2025 3:19:47 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Adopt the 2025-2027 Road Safety Improvement Plan
Order
20
Placement
Consent Agenda
Row ID
128215
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority 2: Corridor lmprovements Gountywide <br />This project aims to design, develop and implement a system of embedded LED markers, roadway <br />edgeline rumble strips and/or carsonite delineation markers to enhance visibility, safety and reduce run-off <br />the road accidents on the identified corridors. The corridors have been identified through analysis of <br />collision data from 2019-2023. Although the crash data is tied to smaller segments of the identified roads, <br />the County believes applying improvements to the entire corridor is more appropriate than the <br />countermeasure application to short segments. <br />First, the project will investigate existing technologies, best practices and relevant regulations, The County <br />will assess the viability of different marker designs, materials, rumble strip patterns and options. Then the <br />County will analyze the coslbenefit ratio along with practicality of implementation at each identified <br />corridor. <br />Next, a plan will be developed for the deployment of the selected treatments on the identified corridors. <br />This includes site selection, installation procedures and integration with existing infrastructure, Project plans <br />and Specifications will be assembled to advertise for the construction and implementation of the <br />improvements, lt is expected that each corridor will have a unique combination of countermeasure <br />improvements, <br />Corridors ldentified through the2025 Safety Plan lnclude: <br />Road Name Milepost Reference Location <br />I Look Rd 0.00-3.30 Sanders Rd to Alford Rd <br />2 No.6 Rd 0.00-5.10 Vantaqe Hwy to Thrall Rd <br />3 Bullfroq Rd 0.00-2.70 l-90 to SR 903 Roundabout <br />4 Cove Rd 1.14-4.14 Robinson Canyon Rd to Manastash Rd <br />5 Thorp Hiqhwav South 0.00-5,30 l-90 Exit 106 to l-90 Exit 101 <br />6 Wilson Creek Rd 0.00-4.87 Vantaqe Hwv to Alford Rd <br />7 Hanson Rd 0,00-3,08 Thoro Hwv South to Cove Rd <br />B Westside Rd 0,19-4.17 South Cle Elum to Tree Haven Rd <br />1_5
The URL can be used to link to this page
Your browser does not support the video tag.