Laserfiche WebLink
2025 Maintenance Rock Materials <br />Bid Opening February 20,2025, at 2:00 p.m. <br />SCHEDULE'B' <br />Vendor to Provide Labor and Equipment to Load Materials <br />Green Dream lnternational LLC <br />I <br />PRrcE PER ToNl rorn- enrce <br />$143,640.00 <br />$206,560.00 <br />$1 55,610.00 <br />$91,770.00 <br />$41,952.00 <br />$79,800.00 <br />$79,800.00 <br />$20,410.00 <br />$20,410.00 <br />$41,040.00 <br />$41,040.00 <br />$20,410.00 <br />$20,410.00 <br />$962.852.00 <br />$23.94 <br />$25.82 <br />$23.94 <br />$26.22 <br />$26.22 <br />$19.95 <br />$19.95 <br />$20.41 <br />$20.41 <br />$20.52 <br />$20.52 <br />$20.41 <br />$20.41 <br />Ellensburg Cement Products <br />I <br />PRICE PER TON I TOTAL PRICE <br />$78,000.00 <br />$104,000.00 <br />$84,500.00 <br />$58,625.00 <br />$26,800.00 <br />$45,200.00 <br />$45,200.00 <br />$11,000.00 <br />$11,000.00 <br />$22,200.00 <br />$22,200.00 <br />$10.750.00 <br />$10,750.00 <br />$530,225.00 <br />$13.00 <br />$13.00 <br />$13.00 <br />$16.75 <br />$16.75 <br />$11.30 <br />$11.30 <br />$11.00 <br />$11.00 <br />$11.10 <br />$11.10 <br />$10.75 <br />$10.75 <br />TTEIIII DSSCRIPTION <br />BST Crushed Surfacino 1/2 to No. 4 <br />BST Crushed Surfacinq 1/2 to No. 4 <br />BST Crushed Surfacinq 1/2 to No. 4 <br />BST Crushed Surfacinq 3/8 to No. 10 <br />BST Crushed Surfacinq 3/8 to No. 10 <br />Maintenance Sand <br />Mainienance Sand <br />1 1/4" Crushed Surfacing Base <br />Course <br />1 1/4" Crushed Surfacing Base <br />Course <br />5/8" Crushed Surfacinq Top Course <br />5/8" Crushed Surfacinq Top Course <br />2112" Ballasl <br />2112" Ballasl <br />Total Schedule "B" - <br />Locatlon <br />Ellensburg <br />East Kittitas <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburg <br />Cle Elum <br />Ellensburq <br />Cle Elum <br />ESTIMATED <br />OUANTITY <br />(ln TONS) <br />6,000 <br />8,000 <br />6,500 <br />3,500 <br />1,600 <br />4,000 <br />4,000 <br />1,000 <br />1,000 <br />2,000 <br />2,000 <br />1,000 <br />1,000 <br />ITEM <br />NO. <br />1 <br />2 <br />J <br />4 <br />5 <br />b <br />7 <br />9 <br />10 <br />11 <br />12 <br />13 <br />SCHEDULE "8"