My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-02-24-minutes-public-works-study-session
>
Meetings
>
2025
>
03. March
>
2025-03-18 10:00 AM - Commissioners' Agenda
>
2025-02-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 12:12:41 PM
Creation date
3/13/2025 12:07:42 PM
Metadata
Fields
Template:
Meeting
Date
3/18/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
128957
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The report of the 2024 annual bridge inspection effort (Exhibit 1), includes any <br />recommendations for bridge replacement and repair. Previous years inspections relied on <br />consultant services for most inspections. PW staff have become certified with <br />Washington State Department of Transportation (WSDOT) to lead the County bridge <br />inspection effort. In 2024 PW staff conducted all bridge inspections except for <br />specialized inspections. Reliance on consultants will continue to be needed for <br />specialized inspections such as underwater and non -redundant steel tension member <br />(previously fracture critical) inspections. <br />FISCAL IMPACT: <br />None <br />ATTACHMENTS: <br />Exhibit 1: 2024 Annual Bridge Inspection Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.