My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Acceptance Letter_Change Order No3
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
Change Order Acceptance Letter_Change Order No3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:09:19 PM
Creation date
2/27/2025 12:09:13 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 3 for the Lower County Transfer Station
Order
6
Placement
Consent Agenda
Row ID
128215
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br /> <br />February 25, 2025 <br /> <br />Belsaas and Smith Construction <br />103 East 4th Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 3 <br /> <br />Mr. Nelson, <br /> <br />I am writing to formally acknowledge and award change order number 3 for the following Change <br />Order Proposals (COP): <br /> <br />COP #05: Electrical vault downsizing. <br />COP #06: Blink charger upgrade. <br />COP #07: Feeder conduit size reduction. <br />COP #08: Credit for redundant switch gear. <br />COP #11: Additional siding and insulation at the transfer station tunnel and push wall. <br />COP #14: Upsizing the compost service hydrants and irrigation lines <br />COP #18: Scale model change. <br />COP #19: Mixer pump deletion. <br /> <br />We propose the following modifications to our contract dated September 3, 2024. <br /> <br />Base Bid and Additive A2 $18,441,939.80 <br />Additive A1 $642,000.00 <br />Change Order No. 2 <$11,754.08> <br />COP #05 <$50,066.00 <br />COP #06 $35,400.42 <br />COP #07 <$25,000.00> <br />COP #08 <$10,000.00> <br />COP #11 $21,172.26 <br />COP #14 $3,249.13 <br />COP #18 $4,517.78 <br />COP #19 <$7,315.00> <br /> <br />Subtotal $19,044,144.31 <br />WSST $1,637,796.41 <br /> <br />Total $20,681,940.72
The URL can be used to link to this page
Your browser does not support the video tag.