Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #18 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTSEQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIPLABOR COST COST COST COST <br />Scale Modifications <br />Added cost 1 LS 0.00 3,945.66 0 <br />0.00 0 0 <br />0.00 0 0 <br /> 0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />0.00 0 0 <br />*TOTALS 0 3,945.66 0 0