My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP14 Upsize Compost Area Service & Hydrants
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
COP14 Upsize Compost Area Service & Hydrants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:09:35 PM
Creation date
2/27/2025 12:09:03 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 3 for the Lower County Transfer Station
Order
6
Placement
Consent Agenda
Row ID
128215
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0-1 H.D. FOWLER <br />COMPANY <br />O Box 160 * Bellevue, WA * 98009-0160 <br />To: cristal <br />cristalt@hdfowler.com <br />BELSAAS & SMITH CONST ING (025250) <br />01/13/25 02:33:37pm <br />From: Faub Faubion <br />Phone: (509) 248-8400 x2410 <br />Order Acknowledgement <br />Non -Stocks, Special Orders or Engineered items may not be returnable. Those that are returnable are subject to a minimum <br />25% restock fee. Some orders may also have applicable freight charges not shown on this Order Acknowledgement. <br />Your PO: Project: <br />Ordered By: DAVE NEWKIRK Order Date: <br />Est. Ship Date: 01/17/25 Order#: <br />Shipping From: Yakima Warehouse Ship VIA: <br />Freight Terms: <br />Line# Item <br />LOWER VALLEY TRANSFER STATION <br />01/06/25 <br />08410988 <br />Will -Call Here (Order & Pickup Now) <br />Unit Qty Price Ext. Price <br />Tax <br />1 2" SDR 11 IPS HDPE PIPE, BLACK (.64 LBS/FT) <br />FT <br />1000 <br />1.33 <br />1,330.00 <br />T <br />STRAIGHT LENGTHS <br />3 2" SDR 11 TRANSITION FITTING IPS HDPE X FIP <br />EA <br />2 <br />117.16 <br />234.32 <br />T <br />316SS NSF APPROVED <br />7 2" X 1" SDR 11 REDUCING TEE IPS HDPE <br />EA <br />1 <br />35.24 <br />35.24 <br />T <br />FABRICATED BUTT FUSION <br />4 2" SDR 11 TEE IPS HDPE MOLDED BUTT FUSION <br />EA <br />2 <br />10.64 <br />21.28 <br />T <br />5 2" SDR 11 90 ELBOW IPS HDPE MOLDED BUTT FUSION <br />EA <br />2 <br />8,69 <br />17.38 <br />T <br />6 2" X 1-1/2" SDR 11 REDUCER IPS HDPE MOLDED <br />EA <br />3 <br />8.97 <br />26.91 <br />T <br />BUTT FUSION <br />8 1" SDR 11 TRANSITION FITTING IPS HDPE X FIP <br />EA <br />1 <br />39.12 <br />39.12 <br />T <br />316SS NSF APPROVED <br />10 1-1/2" SDR 11 TRANSITION FITTING IPS HDPE X <br />EA <br />3 <br />30.34 <br />91.02 <br />T <br />MIP 316SS NSF APPROVED <br />11 WOODFORD U15OM-3 UTILITY HYDRANT T BURY, <br />EA <br />3 <br />947.78 <br />2,843.34 <br />T <br />1-1/2" INLET <br />Total 4,638.61 <br />Freight 0.00 <br />Tax 0.00 <br />Grand Total 4,638.61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.