My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP11 SEACON Design Changes
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
COP11 SEACON Design Changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:11:00 PM
Creation date
2/27/2025 12:09:02 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 3 for the Lower County Transfer Station
Order
6
Placement
Consent Agenda
Row ID
128215
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBCONTRACT CHANGE ORDER <br />Project:Lower Valley Transfer Station Change Order Number:2 (Rev. 1) <br />Subcontractor To: Belsaas & Smith <br />PO Box 926 Initiation Date:1.6.2025 (Rev 1.17.25) <br />Ellensburg, WA 98926 <br /> Project #:4401 <br />Address:2119 Highway 97 <br />Ellensburg, WA 98926 Contract For:PEMB Supply & Erect <br />Contract #:LVTS2024 Contract Date:9/20/2024 <br />Sea Con LLC has been requested to make the following changes in this contract: <br />2.)16,870.00$ <br />3.)Sea Con B&O/PL-PD @ 1.49% for $51,083.50 Contract Change for Change Order #2 761.14$ <br />4.)Sea Con Margin @ 8% on $51,844.64 for Change Order #2 4,147.57$ <br />Total Change Order Amount 55,992.22$ <br />Not valid until signed by the General Contractor/Construction Manager. Signature of the Subcontractor indicates agreement <br />herewith, including any adjustment in the Contract Sum or the Contract Time. <br />The original Contract Sum ...................................................……..............................................................……………..$3,116,581.00 <br />Net change by previously authorized Change Orders.....................................................…...................…………………..$0.00 <br />The Contract Sum Prior to this Change Order....................................................................................………………….$3,116,581.00 <br />The Contract Sum will be (increased) by this Change Order...................…....………………………...............$55,992.22 <br />The new Contract Sum including this Change Order will be.....................................…..........................……………………$3,172,573.22 <br />Agreed To: Sea Con, LLC Authorized:Belsaas & Smith <br />By By <br />Date Date <br />165 NE Juniper Street Suite 100 - Issaquah, WA 98027 - Tel. 425.837.9720 - Fax 425.837.1585 <br />Increase Project 'Minimum Allowable Roof Snow Load' from 25.0 PSF in <br />Specifications to 29.0 PSF for Transfer Building PEMB. PEMB Weight Increased by <br />17,599#. 2,393# Removed from Increased Weight for Additional Wall Panel and Girt <br />Added to Scope. 15,206# @ $2.25/# <br />Additional R-Panel Materials per Brandon's E-Mail with Updated Drawings on <br />11/21/25. Plan set dated 11/5/24. PVDF R-Panel $3.00/SF @ 1,500 SF. Additional <br />Base Channel/Girt Materials per Brandon's E-Mail with Updated Drawings on <br />11/21/25. Plan set dated 11/5/24. 345 LF Galvanized 'C' or 'Z' Girt/Base Channel @ <br />$8.00/LF. Additional Insulation per Brandon's E-Mail with Updated Drawings on <br />11/21/25, plan set dated 11/5/24. 1,500 SF of R-25 Banded Liner System @ $1.50/SF. <br />Labor to Install Additional Siding, Insulation, Base Channel, and Girt per Brandon's E- <br />Mail with Updated Drawings on 11/21/25, plan set dated 11/5/24. Prevailing Wage <br />Man Hours for 60 Additional Hours of Onsite Labor @ $100/Hour.Additional Sea Con <br />GCs and Overhead - 16 Hours @ $85/Hour <br />1.)34,213.50$
The URL can be used to link to this page
Your browser does not support the video tag.