Laserfiche WebLink
SUBCONTRACT CHANGE ORDER <br />Project:Lower Valley Transfer Station Change Order Number:2 (Rev. 1) <br />Subcontractor To: Belsaas & Smith <br />PO Box 926 Initiation Date:1.6.2025 (Rev 1.17.25) <br />Ellensburg, WA 98926 <br /> Project #:4401 <br />Address:2119 Highway 97 <br />Ellensburg, WA 98926 Contract For:PEMB Supply & Erect <br />Contract #:LVTS2024 Contract Date:9/20/2024 <br />Sea Con LLC has been requested to make the following changes in this contract: <br />2.)16,870.00$ <br />3.)Sea Con B&O/PL-PD @ 1.49% for $51,083.50 Contract Change for Change Order #2 761.14$ <br />4.)Sea Con Margin @ 8% on $51,844.64 for Change Order #2 4,147.57$ <br />Total Change Order Amount 55,992.22$ <br />Not valid until signed by the General Contractor/Construction Manager. Signature of the Subcontractor indicates agreement <br />herewith, including any adjustment in the Contract Sum or the Contract Time. <br />The original Contract Sum ...................................................……..............................................................……………..$3,116,581.00 <br />Net change by previously authorized Change Orders.....................................................…...................…………………..$0.00 <br />The Contract Sum Prior to this Change Order....................................................................................………………….$3,116,581.00 <br />The Contract Sum will be (increased) by this Change Order...................…....………………………...............$55,992.22 <br />The new Contract Sum including this Change Order will be.....................................…..........................……………………$3,172,573.22 <br />Agreed To: Sea Con, LLC Authorized:Belsaas & Smith <br />By By <br />Date Date <br />165 NE Juniper Street Suite 100 - Issaquah, WA 98027 - Tel. 425.837.9720 - Fax 425.837.1585 <br />Increase Project 'Minimum Allowable Roof Snow Load' from 25.0 PSF in <br />Specifications to 29.0 PSF for Transfer Building PEMB. PEMB Weight Increased by <br />17,599#. 2,393# Removed from Increased Weight for Additional Wall Panel and Girt <br />Added to Scope. 15,206# @ $2.25/# <br />Additional R-Panel Materials per Brandon's E-Mail with Updated Drawings on <br />11/21/25. Plan set dated 11/5/24. PVDF R-Panel $3.00/SF @ 1,500 SF. Additional <br />Base Channel/Girt Materials per Brandon's E-Mail with Updated Drawings on <br />11/21/25. Plan set dated 11/5/24. 345 LF Galvanized 'C' or 'Z' Girt/Base Channel @ <br />$8.00/LF. Additional Insulation per Brandon's E-Mail with Updated Drawings on <br />11/21/25, plan set dated 11/5/24. 1,500 SF of R-25 Banded Liner System @ $1.50/SF. <br />Labor to Install Additional Siding, Insulation, Base Channel, and Girt per Brandon's E- <br />Mail with Updated Drawings on 11/21/25, plan set dated 11/5/24. Prevailing Wage <br />Man Hours for 60 Additional Hours of Onsite Labor @ $100/Hour.Additional Sea Con <br />GCs and Overhead - 16 Hours @ $85/Hour <br />1.)34,213.50$