Laserfiche WebLink
Priority 3: Huntzinger Road Safety Improvements <br />N <br />b <br />d <br />i� <br />r <br />Huntzinger Rd <br />twmps qe w,r„ t <br />Roads Owned By: <br />� wwmrn.nv p au,rc>,ry <br />• Phase 2 is between MP 2.70 to MP 5.14 where road segments have several horizontal curves, <br />steep embankments, and no shoulder in places with minimal countermeasures in place. <br />ESTIMATED COST = $1,857,735 <br />19 <br />