Laserfiche WebLink
BELSAA <br />SMITH <br />BELSASC0330H <br />January 30, 2025 <br />Re: Change Order Proposal #10 <br />P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 <br />bra ndon@belsmith.com <br />Per the description below, we offer the following change order proposal #10 (COP#10). <br />COP 10 includes the cost associated with up sizing louvers 14-1, 16-1, and 16-2 per submittal <br />response #14.2. <br />Total cost to be implemented into the contract <br />Time extension required: 0 days <br />Sincerely, <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />$ 601.13+ WSST <br />