Laserfiche WebLink
BELSAAS <br />8c <br />SMITH <br />BELSASC0330H <br />January 30, 2025 <br />Re: Change Order Proposal #02 <br />P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br />ELLENSBURG, WA 98926 <br />509-925-9747 <br />brandon@belsmith.com <br />Per the description below, we offer the following change order proposal #02 (COP#02). <br />COP 02 includes the cost savings of substituting the fence slats per submittal #23. A well as the <br />additional cost for removing the additional fence which was inaccurately shown on the demo <br />plans. <br />Total cost to be implemented into the contract <br />Time extension required: 0 days <br />Sincerely, <br />Brandon Drexler, <br />Belsaas & Smith Construction <br />$ 1,034.67 + WSST <br />