My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-02-10-minutes-public-works-study-session
>
Meetings
>
2025
>
03. March
>
2025-03-04 10:00 AM - Commissioners' Agenda
>
2025-02-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 12:10:42 PM
Creation date
2/27/2025 12:08:22 PM
Metadata
Fields
Template:
Meeting
Date
3/4/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
128215
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Projects for the Safety Plan are identified by compiling fatal and serious injury crash data <br />provided by WSDOT as well as an analysis of the infrastructure around incident sites <br />including safety features, signage, pavement conditions, road geometry, and drainage. <br />Projects are developed utilizing this strategy and ranked by county staff on several <br />conditions. <br />DISCUSSION: <br />Through analysis of this data, Public Works anticipates this year's Safety Plan to include <br />the following: <br />Kittitas Hwy at No. 6 Road Intersection Improvements. Public Works has made <br />several incremental improvements at the intersection over the last few years, but the <br />criteria (specifically crashes in the last 5 years) evaluated in the Safety Plan still identifies <br />a need at this location. This project would identify a large-scale capital improvement <br />project at the intersection. <br />Huntzinger Guardrail Phase 2. Public Works is currently in the design phase for <br />guardrail improvements on the first phase of improvements addressing approximately <br />half of the road segment. This project would look to fund the remaining road segment. <br />Corridor Improvements Countywide. The compiled data shows a trend of serious <br />accidents which happen on certain high -volume roads throughout the County including <br />Look Road, Hanson Road, Cove Road, Bullfrog Road, etc. which could be mitigated with <br />minor improvements to the corridor. Improvements may include embedded LED <br />markers, roadway edge -line rumble strips, and/or carsonite delineation markers to <br />enhance visibility. The low cost of these improvements makes bundling several projects <br />together an option for addressing several high -risk areas at once. <br />Denmark Road Corridor Improvements. Denmark Road from Tjossem Road to Fourth <br />Parallel Road has several safety concerns including narrow structures, non -compliant <br />horizontal and vertical curve, and drainage concerns. This project would address all <br />identified safety risks within this corridor. <br />Bridge and Structure Improvements. Throughout the County there are numerous <br />bridges and structures with identified safety concerns including unprotected side slopes <br />and narrow lane widths. This project may include a County Wide evaluation of existing <br />structures, as well as an implementation phase to address the safety concerns specifically. <br />Public Works intends to present the complete Safety Plan for adoption at the regular <br />Agenda session on March 4, 2025, in order to submit applications for funding by the <br />March 15, 2025, deadline. <br />FISCAL IMPACTS: <br />Previous HSIP projects have been authorized for 100% Federal Funding if the County <br />obligates the construction funding within approximately 2.5 years of award. <br />Page 2 of 2 <br />Public Works "Work Session Staff Report", 2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.