Laserfiche WebLink
The report of the 2024 annual bridge inspection effort(Exhibit 1), includes any <br /> recommendations for bridge replacement and repair. Previous years inspections relied on <br /> consultant services for most inspections.PW staff have become certified with <br /> Washington State Department of Transportation(WSDOT)to lead the County bridge <br /> inspection effort. In 2024 PW staff conducted all bridge inspections except for <br /> specialized inspections. Reliance on consultants will continue to be needed for <br /> specialized inspections such as underwater and non-redundant steel tension member <br /> (previously fracture critical) inspections. <br /> FISCAL IMPACT: <br /> None <br /> ATTACHMENTS: <br /> Exhibit 1: 2024 Annual Bridge Inspection Report <br />