Laserfiche WebLink
DEPARTMENT OF <br />ECOLOGY <br />State of Washlngton <br />STATE OF WASHINGTON <br />REPORT OF EXAMINATION <br />FOR WATER RIGHT CHANGE <br />Changed Place of Use <br />Changed Purpose of Use <br />APPI.ICATION DATE WATER RIGHT CHANGE APPTICATION NUMBFR <br />October 30,2OL7 CS4-01141sb10 <br />PRIORIW DATE OF CTAIM PROPOSED FOR CHANGE CTAIM NUMBER PROPOSED FOR CHANGE <br />june 30, 1872 Court Claim Ot74L (S4-84509-J) <br />NAME AND MAITINC ADDRESS SITE ADDRESS (IF DIFFERENT} <br />Kittitas County <br />205 West 5th Avenue <br />Ellensburg, WA 98908 <br />10891Brlck MillRoad <br />Ellensburg, WA 98925 <br />Feet per ac-ft/yr = Acre-fe€t per Year <br />* UndertheSubbaslnl0adjudication,theAcguavellocourtauthorizedtheuseofadditional quantitiesofwaterwhensurplus <br />wjter is avajlable in excess of that needed to satisfy all existing rights. This water is normally avallable approximately <br />3g-days during sprlng, Based upon the herein tentative determination, such additional quantities total 0'98 cfs and <br />58.08 acre-feet/year, Thus, the combined annual quantity for lnstream flow and mitlgation (including surpfus water) equals <br />249,42 acrc-feet, <br />** When frost is out of the ground before April 15, the period of use is modified to allow use of water as soon as frost is out of <br />the ground and water can beneficially be used, <br />Erhiuitc <br />ANNUAL quANTlrY (ac-ft/yr)DlvERSloN RATE (cfs) <br />249.42*Primary Reach: 1.08* <br />110.06Secondary Reach:0.70 <br />Total Rate and Quantity Authorized for Diversion <br />PEN]OD OF USEANNUAT qUANTITV (ac-ft/yr)DIVERSION RATE (cfs)PURPOSE <br />April 15 - <br />August L5**1.08 cfs 249.42*Primary Reach: <br />lnstream Flow and Mitigation <br />110,06 <br />April L5 - <br />August 15*xo.70Secondary Reach: <br />lnstream Flow and Mitigation <br />Purpose(s) <br />Change Repoit of Examination Page 1 of 15 Water Right File No. CS4-01141sb10