My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SH23-027 Customer Implementatoin Guide LE
>
Meetings
>
2025
>
02. February
>
2025-02-18 10:00 AM - Commissioners' Agenda
>
SH23-027 Customer Implementatoin Guide LE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 12:08:39 PM
Creation date
2/13/2025 12:05:35 PM
Metadata
Fields
Template:
Meeting
Date
2/18/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Acknowledge a Contract between Kittitas County and Flock Group, Inc., for Adding Flock Cameras and the Data-Sharing Capabilities of this System in Kittitas County
Order
3
Placement
Consent Agenda
Row ID
127511
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Flock will provide and mount an AC adapter that a qualified electrician can <br />connect to AC power but cannot make any AC connections or boreholes in <br />any material other than dirt, grass, loose gravel (or other non-diggable <br />material). <br />• Concrete cutting <br />• Private utility search for privately owned items not included in standard 811 <br />procedures (communication, networking, sprinklers, etc.) <br />• Upgrades to power sources to ready them for Flock power (additional fuses, <br />switches, breakers, etc.) <br />• Any fees or costs associated with filing for required city, county, or state <br />permits <br />• Licensing or attachment agreements with asset / infrastructure owners <br />• Utility contracts and billing <br />• Customer requested relocations (see fee schedule) <br />COST: $650 per camera (one time cost) <br />Included In Scope: <br />Once designated locations are approved by the customer, as part of the <br />Standard Implementation Service Flock will perform the following: <br />• An in -person site survey to confirm the installation feasibility of a location <br />(location assessment, solar assessment, visibility review, etc.) <br />• Confirm that a location is safe for work by following state utility locating <br />procedures. Work with local utilities to prevent service interruptions <br />during the installation <br />o Engage 811 'Call -before -you -Dig' system to receive legal dig date <br />o Apply approved markings Coordinate with 811 regarding any necessary <br />high -risk dig clearances or required vendor meets <br />• Each installation may include the following: <br />o Installation of camera and solar panel with standard, 12'above grade <br />Flock breakaway pole <br />flock safety 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.