My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SH23-027 Customer Implementatoin Guide LE
>
Meetings
>
2025
>
02. February
>
2025-02-18 10:00 AM - Commissioners' Agenda
>
SH23-027 Customer Implementatoin Guide LE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 12:08:39 PM
Creation date
2/13/2025 12:05:35 PM
Metadata
Fields
Template:
Meeting
Date
2/18/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Acknowledge a Contract between Kittitas County and Flock Group, Inc., for Adding Flock Cameras and the Data-Sharing Capabilities of this System in Kittitas County
Order
3
Placement
Consent Agenda
Row ID
127511
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*Fee Schedule <br />After a deployment plan with Designated Locations and equipment has been agreed <br />upon by both Flock and the Customer, any subsequent changes to the deployment <br />plan ("Reinstalls") driven by a Customer's request will incur a fee per the table below. <br />What Services Incur Fees: <br />• Requested relocations post -approval by customer <br />• Relocations due to poor performance will be the responsibility of Flock <br />o If a customer requests a location against the advisement of Flock, <br />performance issues and any requested relocations will be the responsibility of <br />the customer. <br />• Per the contract and absent a defect, in the event that Flock Hardware is lost, <br />stolen, or damaged, Customer may request that Flock replace the Flock <br />Hardware at a fee according to the then -current Reinstall policy <br />https://www.flocksafety.com/reinstall-fee-schedule <br />• Misc billables for out of scope items for each implementation <br />Incurred Fees: <br />• Camera relocation <br />o Existing infrastructure (non -AC powered)......................................................... $350 <br />o Flock pole (non -AC powered)............................................................................... $750 <br />o Advanced pole (non -AC powered)................................................................... $5000 <br />• Replacements <br />o Camera only as a result of vandalism, theft, or damage .............................. $800 <br />o Pole replacement only as a result of vandalism, theft, or damage <br />■ Flock pole........................................................................................................... $500 <br />■ Advanced pole................................................................................................ $5000 <br />o Full replacement as a result of vandalism, theft, or damage <br />° ■ Flock pole, camera, and solar (non -AC Powered) .................................. $1300 <br />■ Advanced pole, camera, and solar (non -AC Powered) .......................... $5800 <br />flock safety 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.