Laserfiche WebLink
Electrician Handout <br />Electrician Installation Steps <br />1. Run AC cable and conduit to the box <br />according to NEC Article 300 and any <br />applicable local codes. The gland <br />accepts'/2" conduit. <br />2. Open the box using hinges. <br />3. Connect AC Mains per wiring diagram <br />below: <br />4- <br />a. Connect AC Neutral wire to the Surge Protector white Neutral wire using the <br />open position on the lever nut. <br />b. Connect AC Line wire to the Surge Protector black Line wire using the open <br />position on the lever nut. <br />c. Connect AC Ground wire to the Surge Protector green ground wire using the <br />open position on the lever nut. <br />4. Verify that both the RED LED is lit on the front of the box <br />5. Close box and zip tie the box shut with the provided zip tie <br />6. While still on -site, call Flock, who will remotely verify that power is working <br />correctly: <br />Southeast Region - (678) 562-8766 <br />West -Region - (804) 607-9213 <br />Central & NE Region - (470) 868-4027 <br />SURGE PROTECTOR AGOC CONVERTER 24V SOW RED PALL LIGHT CAMERA <br />L ACA <br />,20VAC V� FROM UG"t POLE N <br />ACM v <br />flock safety 15 <br />