Laserfiche WebLink
May 31. 2024 <br />SO Alliance. <br />RE: Ellensburg Parking Lot Project, Special Inspections and Testing: <br />Date ;Men, <br />(.:Sl is pleased m provide you wirh rile fol'[OWltlg cast estitn:ue for special testing on your project. \Ve <br />understand the scope of work to include concrete resting & soil & asphalt compaction testing. '.I'lle lollowirn? <br />tal:9les are a breakdown of the tests and time needed ro complete die riegl nt:ed inspections arui rest::. 'l ivies <br />and cost treat' van- depending can cont-racrot•'s construction schedule. <br />Field Testing <br />"file following table lists rile projected t7mc ou sire. Tile nurnbe.r of tests sand time mly va.ry depending on the <br />cont:ractrst's placement schedule. <br />Technician III: Compaction Testing <br />12 hrs. <br />(a. <br />$72 <br />$$G4 <br />Technician III: HMA Compaction <br />10 hrs. <br />I (c% <br />$72 <br />$720 <br />Technician III: Concrete Testing <br />5 iirs. <br />c ? <br />$72 <br />360 <br />:;tsal: <br />S 1,944 <br />Laboratory 'Testing <br />The following tahle lisrs rile number and tepes Of tests that will he necdcd. ( lie iiutnber of tests may pan <br />depending Loll requirements. <br />HMA Extraction, Gradation & Moisture <br />1 <br />611% <br />$325 <br />$325 <br />Concrete Cylinder Strength Testing <br />— <br />$30 <br />$240 <br />Sieve Analysis <br />1 <br />(�;. <br />$95 <br />-- -$95 --- - <br />Proctor <br />1 <br />(�z�, <br />$175+ <br />$175 <br />Crushed Surface Gradation <br />3 <br />Ci� <br />$9.5 <br />$285 <br />Crushed Surface Fracture Face <br />_, <br />(F4 <br />$70 <br />$210 <br />Crushed Surface Sand Equivalent <br />3 <br />fci <br />!,70 <br />1210 <br />Crushed Surface Proctor <br />2_ <br />c <br />S175 <br />$350 <br />_ <br />Total: <br />S 1.,1;c)I) <br />