My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2025-018
>
Meetings
>
2025
>
01. January
>
2025-01-21 10:00 AM - Commissioners' Agenda
>
Resolution 2025-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2025 11:14:30 AM
Creation date
2/5/2025 11:14:08 AM
Metadata
Fields
Template:
Meeting
Date
1/21/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Adopting the Kittitas County Airport 2024 Wildlife Hazard Evaluation and Management Plan
Order
22
Placement
Consent Agenda
Row ID
126584
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowers Field WildlifeHazard Management Plan <br />I Background <br />Kittitas County Airport (Bowers Field [ELN]) is a public use general aviation (GA) <br />airport. The airfield is in central Washington, atthe northern end of the city of <br />Ellensburg, and is managed by the city. The mission is to operate and develop the <br />Airport and Industrial Park in a safe and efficient manner, support professional aviation <br />education programs, enhance the economic benefit to the County, and support local and <br />regional e-"tg"n"y preparedness. In support of this, ELN management decided to <br />develop a wildlife hazardmanagement plan (WHMP) to serve as guide for reducing <br />wildlife hazards at the airfield. <br />A wildlife hazardassessment (WHA) is conducted to gather wildlife hazards information <br />at an airport and that information aides in the development of a WHMP. Because ELN is <br />not a Part 139 Certificated airport and is not held to the same regulations and a WHA is <br />not required. ELN requested assistance from the United States Department of <br />Agriculture, Wildlife Services (USDA WS) in developing the WHMP. USDA WS <br />conducted a wildlife hazardevaluation (WHE) to identify hazardous wildlife and <br />attractants negatively impacting aviation safety. A WHE is a simplified form of a WHA, <br />with fewer site visits and less stringent surveys. The WHE is Chapter 2 of this document <br />and was used in the development of the WHMP. <br />USDA WS is the primary federal agency authorized to assist public and private entities <br />with addressing wildlife hazards and protecting property and safety from wildlife <br />damage. USDA WS has a Memorandum of Understanding with the National Association <br />of Staie Aviation Officials and the Federal Aviation Administration (FAA) recognizing <br />WS' expertise in identi$'ing and mitigating wildlife hazards for aviation safety. <br />USDA WS regularly provides hazardous wildlife management training to airports <br />throughout the country and was integral in the development of the Washington State <br />Department of Transportation's 2009 Aviation Stormwater Design Manual; the first <br />stormwater design manual in the United States to specifically address hazardous wildlife <br />management atlaround airPorts. <br />1.1 Locational Aspects <br />Bowers Field encompasses 1,240 acres and has one runway. Runway lI-29, is 4,300 feet <br />long and 150 feet wide. It is equipped with transmitter-activated lighting, making it <br />uuuilubl"24 hours a day. There are two fixed-based operators, a fueling facility, and 12 <br />county-owned T-hangars. There were an average of 165 operations per day during2020. <br />The ientral Washington University aviation program is operated out of ELN and is <br />responsible for nearly 90%o of the annual operations. <br />Urban sprawl is encroaching upon the airfield from the south and southwest. Agriculture <br />and ranching are the primary land uses in the other three directions. There are numerous <br />31 December 2024 <br />1-l
The URL can be used to link to this page
Your browser does not support the video tag.