My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSK-yakima river_2024.10.29 (2)
>
Meetings
>
2024
>
10. October
>
2024-10-29 9:00 AM - 2025 Budget Meeting
>
PSK-yakima river_2024.10.29 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2025 11:24:55 AM
Creation date
2/3/2025 9:42:44 AM
Metadata
Fields
Template:
Meeting
Date
10/29/2024
Meeting title
2025 Budget Meeting
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Special
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Milepost 8 Boat Launch <br /> Mile post 8 (mile post 8 } WDFW owned Recommend WDFW left bank land holdings <br /> be swapped with BLM right bank land holdings. Reduce site management costs and <br /> present an uniform branding/fee system in the Yakima River Canyon. Improvement <br /> interpretive signage, , Vault Toilet, Pack in pack out , day use only Improve boat <br /> Launch to the material condition of the Columbia River Apricot Orchard launch <br /> managed by Grant PUD. WDOT no parking zone 1,000 feet of site entrances to <br /> improve public traffic safety. WSDOT corridor sketch summary 3/29/2018 "What <br /> needs to change?There are a number of issues with the pull-off areas including <br /> their location, entry and exit points, and size within the Yakima River Canvon ". <br /> !.•,�.y "3 '' a ':�#�:a-:°:-ti�E�:. lµ�'�Z' .��'reµ':.'� <br /> pc <br /> -'i? # -emso . ............... E•;-'� <br /> .armor •a-' ��.I 'Z.0.- # A 0h._ '1 <br /> 11 - nf.w <br /> Milepost 8 Boat Launch <br /> fp <br /> X P <br />
The URL can be used to link to this page
Your browser does not support the video tag.