Laserfiche WebLink
Dept.of Public Works <br /> Page 2 <br /> 2. Secure the development and/or operation of new aeronautical and aerospace products, <br /> services, and facilities by 2024. <br /> 3. Increase the economic impact of the Airport on the community by twenty percent (20%) <br /> by the end of 2024. <br /> 4. Improve and enhance the safety, security, and efficiency of the Airport's airside <br /> infrastructure by the end of 2023. <br /> The AAC and airport staff continue to work towards a collaborative effort to accomplish the <br /> goals above. Focus was given to items three and four. This was primarily accomplished through <br /> the economic report work done by J-U-B Engineers. Safety has also been a focus by working <br /> through expanded mowing and weed abatement schedule and the finalization of the Wildlife <br /> Hazard Evaluation and Management Plan. <br /> A T-Hangar lease policy and waitlist policy were adopted for use at Bowers Field. This will assist <br /> in providing current information to prospective lease holders as well as being able to better track <br /> the status of applications. <br /> The model airplane club has been a longtime user of property at Bowers Field. The Club held a <br /> revocable license for use of a portion of the property, which expired. This revocable license was <br /> renewed with support from the AAC. <br /> Support of a City of Ellensburg application was provided for a Palouse To Cascade trail <br /> connection grant. A portion of the connecting trail would be along the Airport property. The AAC <br /> offered their support of the project. <br /> Accomplishments Achieved: <br /> • Improved maintenance of airside and landside property <br /> o Expanded schedule of mowing and weed abatement <br /> o Improved Foreign Object Debris Program (FOD) awareness and mitigation <br /> program. Partnered with Central Washington University flight school for a FOD <br /> walk of the runway. <br /> o Taxiway shoulder gravel leveling project completion <br /> o Timely snow removal and Notice to Air Missions (NOTAMs) filing <br /> o Removal of abandoned concrete foundations <br /> • Airport Projects <br /> o Wetland mitigation project construction complete. Currently monitoring to ensure <br /> plant survivability. <br /> o Previous wildlife assessment analysis completed, and draft Wildlife Hazard <br /> Evaluation and Management Plan completed and presented. <br /> o The apron reconfiguration and taxi lane rehabilitation project was constructed. <br /> This included funding from the FAA and WSDOT Aviation grant funding. <br /> o Design on the parallel taxiway continues to progress. Although discretionary <br /> funding had been removed by the FAA, the consultant is working to finalize <br /> plans. Once plans are complete, the project will be in a position to move forward <br /> with review by the FAA. <br /> • Private Development <br /> o One General Aviation (GA) hangar constructed <br /> 411 North Ruby Street, Suite 1 TEL (509)962-7523 <br /> Ellensburg,WA 98926 FAX (509)962-7663 <br />