My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2025-001
>
Meetings
>
2025
>
01. January
>
2025-01-07 10:00 AM - Commissioners' Agenda
>
Ordinance 2025-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2025 12:57:21 PM
Creation date
1/13/2025 12:56:39 PM
Metadata
Fields
Template:
Meeting
Date
1/7/2025
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve an Ordinance for the 2024 Annual Docket Amendments to the Comprehensive Plan
Order
12
Placement
Consent Agenda
Row ID
125743
Type
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County, through the acceptance of the construction plan, drainage report, or other engineering <br />document as a submittat assumes no responsibility for the completeness, accuracy, and/or adequacy of the <br />submitted material. <br />1 2.04.1 0.050 Submittal Procedure. <br />ptans for proposed road and drainage construction shall be submitted to the Department of Public Works <br />as follows: <br />A. The first submittal shall consist of two complete sets of preliminary civil engineering plans, along <br />with drainage calculationt and other repotts and supporting information. The plans shall be <br />submitted at plat application. The submittal shall consist of conceptual design level plans, profiles, <br />roadway cross section, stormwater plan as required by KCC 12.04 Article V, utilities plan, and <br />signage and striPing Plan. <br />B. lf corrections are required, the County will return a redlined print showing necessary corrections <br />within 30 days. The applicant's engineer shall return the redlined print, a response letter identifying <br />and documenting how the comments were addressed, and the corrected plans with the changes <br />highlighted. <br />C. The second submittal shall consist of two complete sets of final civil engineering plans, and <br />revisions completed per previous County comments. This submittal shall also include: final <br />grading plans and profile plans, final stormwater plan, construction details, temporary erosion and <br />sediment control plan, and any supporting documents such as stormwater calculations, <br />geotechnical reports, environmental studies and transportation impact analysis. The plans shall be <br />signed and stamped by the developer's engineer. The developer's engineer must be a civil engineer <br />licensed in the State of Washington. Review fees, when adopted and applicable, shall be paid by <br />the developer before review of the plans by the County commences. <br />D. lf corrections are required, the County will return a redlined print showing necessary corrections <br />within 30 days. The applicant's engineer shall return the redlined print, a response letter identi{ying <br />and documenting how the comments were addressed, and the corrected plans with the changes <br />highlighted- <br />E. This procedure shall be followed for each additional submittal if necessary. Subsequent submittals <br />shall also contain two complete sets of ptans and other supporting documents and information, if <br />corrected. <br />Title 12 Kittitas County Code I Draft No. 5 - Working Draft for Adoption 1O/72/2A23 <br />84
The URL can be used to link to this page
Your browser does not support the video tag.