My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01.13.2025 PW SS Briefings
>
Meetings
>
2025
>
01. January
>
2025-01-13 1:30 PM - Public Works Study Session
>
01.13.2025 PW SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2025 2:24:11 PM
Creation date
1/9/2025 2:07:53 PM
Metadata
Fields
Template:
Meeting
Date
1/13/2025
Meeting title
Public Works Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
meeting the requirements of 14 CFR Part 139 commonly related to air carrier operations. <br /> As ELN is not Part 139 certificated airport, it is not held to that standard. In place of a <br /> Wildlife Hazard Assessment (WHA), required for Part 139 airports, a Wildlife Hazard <br /> Evaluation (WHE) was conducted to identify hazardous wildlife and attractants which <br /> could possibly impact aviation safety. Staff from the USDA WS helped develop the <br /> WHMP including conducting the WHE. <br /> The WHMP is developed with the intent of increased safety. At the time of plan <br /> development, no wildlife strikes were reported for ELN. The WHMP includes a practical <br /> discussion for dealing with key hazard groups identified during the WHE, this included <br /> blackbirds, corvids, raptors and waterfowl. This plan also includes information on habitat <br /> management to take proactive measures to reduce attractiveness to wildlife. The plan also <br /> recommends periodic reviews and updates by airport staff. <br /> FISCAL IMPACT: <br /> WHMP identifies work items which can be accomplished within the current maintenance <br /> and operations budget. Future years' work will require evaluation of annual budget. <br /> ATTACHMENTS: <br /> Draft Bowers Field Wildlife Hazard Management Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.