Laserfiche WebLink
ANI) <br />Water Right Number: <br />Source: <br />Purpose of Use: <br />Period of Use: <br />Place of Use: <br />Point of Diversion: <br />Priority Date: <br />Quantity <br />August; 0.052 cfs and3.07 ac-ft in September; 0.007 <br />cfs and 0.44 ac-ft. in October <br />s4-85 198-J <br />First Creek, tributary to Swauk Creek <br />Instream flow and mitigation <br />October 16 to March 31 <br />The primary reach begins at the original point of <br />diversion located 800 feet south and 100 feet east <br />from the north quarter corner of Section 30, within <br />Government Lot 1, Section 30, T. 20 N., R. 18 <br />E.W.M., on First Creek and extends downstream to <br />the confluence of First Creek and Swauk Creek (3.9 <br />river miles), downstream to the confluence of Swauk <br />Creek and the Yakima River (7.5 river miles), and <br />extends to the point where Reecer Creek enters the <br />Yakima River (16 river miles, for a total of 27 .4 river <br />miles). <br />When the consumptive portion of the instream flow <br />right is not being used for mitigation, the unused <br />quantity will be added to target flows at Parker Dam <br />and continue downstream to the confluence ofthe <br />Yakima and Columbia Rivers. <br />N/A <br />November 2,1877 <br />Primary Reach - 0.024 cubic foot per second from <br />October 16 to March 31,7.9 acre-feet per yr (ac- <br />ff/yr) to be distributed as follows: <br />0.71 acre-feet (ac-ft) from October l6 to October 31; <br />I.42 ac-ft. in November;1.47 ac-ft in December; 1.47 <br />ac-ft in <br />January; 1.37 ac-ft. in February; 1.46 ac-ft in March <br />t2