Laserfiche WebLink
M1,21:1111 ---I <br />&1�4 _ • I �*: N <br />In addition to providing all material and labor, the Contractor shall perform the following: <br />Remove and dispose of ACM acoustical insulation finish material at each of the <br />damaged/delaminated locations surrounding ceiling HVAC registers in the Treasurer's <br />Office and Assessor's office. <br />Apply a bridging encapsulant to the exposed surface where the ceiling has been removed. <br />Pre and post abatement PCIVI Clearance air sample in the work area, will be done by <br />Fulcrum for analysis, and return for NPE removal upon receipt of satisfactory air clearance <br />results. <br />Professional Services Agreement (rev. 09/24/2018) <br />Page 13 of 17 <br />