Laserfiche WebLink
� �CPgCADES...-TO THgOOLL�i <br /> �40 °f9 KITTITziS COUNTY <br /> - DEPARTMENT OF PUBLIC WORKS <br /> HITTITAS COUNTY <br /> If Ecology deems the 2015 technical work unsuitable to use for the proposed permit application, <br /> then Aspect will complete a comprehensive technical memorandum including all of the <br /> components listed in the Phase 1 CRA contract. These components include: <br /> • Describe the hydrogeologic conceptual model of the proposed project site. This needs to <br /> include but not limited to 1) Identify and describe the aquifer properties of the source <br /> aquifer. 2) Identify source aquifer boundary conditions. 3) Identify water level trends in <br /> the source aquifer. 4) Estimate the water budget for the source aquifer. <br /> • Describe the physical and legal availability of water in the proposed project areas. <br /> • Impairment Analysis - Identify all senior water rights and yet-to-be-processed senior <br /> water right applications within the same source aquifer. Identify and quantify impacts to <br /> senior water rights in the source aquifer. <br /> • Identify and quantify impacts to surface water bodies and tributaries <br /> • A site map showing the place of use and point(s) of withdrawal for all related water rights, <br /> ensuring clarity on project boundaries and infrastructure. <br /> • A vicinity map showing the location of all senior water rights and any senior water right <br /> applications within the same source aquifer,providing context to their proximity to the <br /> proposed project. <br /> • A groundwater elevation map showing groundwater elevation contours based on area well <br /> reports and published source material. This map should clearly depict all surface water <br /> features, as well as assumed groundwater divides,to illustrate the relationship between <br /> groundwater and surface water bodies. <br /> • A geologic cross section based on available area well reports and published source material, <br /> showing the subsurface conditions relevant to the proposed project. <br /> Budget under this task will be largely dependent on Ecology's feedback on the Phase 1.1 <br /> deliverable. If the Phase 1.1 deliverable is not accepted Aspect cannot predict the level of effort <br /> that Ecology will require for Phase 1.2. We have prepared this scope based on similar <br /> assessments performed in the past and will advise the County of progress as key milestones are <br /> reached in the scope above in the event unforeseen issues arise. <br /> Under Phase 1.2 Aspect has budgeted for up to 2 virtual meetings with Ecology and or the <br /> County. <br /> Phase 2.1 Draft Report of Examination and Public Notice ($13,500) <br /> Under this Phase,Aspect will prepare the permitting documents required under Phase 2 of the <br /> CRA. These documents include the draft Report of Examination, the public notice, and the draft <br />