My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-10-22-minutes-cds-study-session
>
Meetings
>
2024
>
11. November
>
2024-11-19 10:00 AM - Commissioners' Agenda
>
2024-10-22-minutes-cds-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 1:19:38 PM
Creation date
11/14/2024 1:00:08 PM
Metadata
Fields
Template:
Meeting
Date
11/19/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
124307
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii. Section R105.3.2 Expiration of Application <br />1. If, after a plan review has been initiated, an application for building permit requires <br />corrections, a letter will be sent notifying the applicant of those items necessary to <br />complete the review of the application and that the application will expire 180 days from <br />the date of notification if the corrections are not submitted or are not adequate to <br />resolve the corrections items listed. The Building Official is authorized to grant one <br />extension, not to exceed 365 days. The extension shall be requested in writing, prior to <br />permit application expiration, and justifiable cause shall be demonstrated. if expired, the <br />application becomes null and void and the deposit is forfeited. <br />2. After a plan review has been completed, a letter will be sent notifying the applicant that <br />the permit is ready for issuance and that if not purchased 180 days from the date of <br />notification, the application will expire. The Building Official is authorized to grant one <br />extension, not to exceed 365 days. The extension shall be requested in writing, prior to <br />permit expiration, and justifiable cause shall be demonstrated. if expired, the application <br />becomes null and void and the deposit is forfeited. <br />iii. Section 112 Board of Appeals <br />1. All appeals shall be heard by the Kittitas County Hearings Examiner. <br />The_most current edition of th, International Mechanical Code (IMC), 28itien,-published by the International Code Council <br />as adopted and amended by the State of Washington in Chapter 51-52 WAC; including the adoption of and amendments to <br />the 2818-most current edition of thz International Fuel Gas Code (IFGC), the 2A4-most current edition of tht. National Fuel Gas <br />Code (NFPA 54) and the 28U-most current edition of the Liquefied Petroleum Gas Code (NFPA 58). <br />The most current edition of the International Fire Code (IFC), 20 it+ , published by the International Code Council as <br />adopted and amended by the State of Washington in Chapter 51-54A WAC; including those standards of the National Fire <br />Protection Association specifically referenced in the International Fire Code: PROVIDED, that, notwithstanding any wording in <br />this code, participants in religious ceremonies shall not be precluded from carrying hand-held candles. The following <br />appendices and amendments are specifically adopted: <br />a. Appendices <br />i. Appendix B: Fire Flow for Buildings <br />ii. Appendix C: Fire Hydrant Locations and Distribution <br />iii. Appendix D: Fire Apparatus Access Roads <br />iv. Appendix E: Hazard Categories <br />V. Appendix F: Hazard Ranking <br />
The URL can be used to link to this page
Your browser does not support the video tag.