My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-01-22-minutes-it-study-session
>
Meetings
>
2024
>
11. November
>
2024-11-05 10:00 AM - Commissioners' Agenda
>
2024-01-22-minutes-it-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 12:04:23 PM
Creation date
10/31/2024 12:03:25 PM
Metadata
Fields
Template:
Meeting
Date
11/5/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
123866
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />BOARD OF COUNTY COMMISSIONERS <br />STAFF REPORT FOR <br />STUDY SESSION <br />Information Technology <br />STUDY SESSION DATE: 1/22/2024 <br />TOPIC: Request Board Approval of Datacenter Hardware Purchase <br />ACTION REQUESTED: Approval <br />LEAD STAFF: Zane Kinney <br />RECOMMENDATION: IT staff recommends the purchase of datacenter hardware one <br />year in advance of its scheduled replacement. <br />BRIEFING SUMMARY: <br />• Major hardware components of the datacenter are scheduled for replacement in <br />2025. <br />• The hardware specifications required for the planned 2024 Cayenta upgrade <br />exceed our current datacenter equipment. <br />• This expenditure was anticipated, and an estimated cost was budgeted for this <br />year. <br />BACKGROUND: In 2023 the Auditor's office spearheaded a project to select an ERP for <br />the County, the result of which was the decision to upgrade Cayenta and expand the <br />scope of its functions. IT was consulted and made an early estimate of the cost of the <br />hardware requirements to run the new software. <br />DISCUSSION: After deliberation, the IT department determined the wisest use of <br />County funds would be to replace our current datacenter hardware with the equipment <br />required to host the new Cayenta software. This decision will also benefit the County's <br />entire technology environment. This equipment was already scheduled for replacement in <br />2025. <br />The installation and configuration of, and cutover to this equipment is a complex and <br />serious procedure. A timely purchase will help avoid delays in the Cayenta upgrade <br />project, as well as necessary sever operation system upgrades. <br />FISCAL IMPACTS: This purchase was anticipated and was included in the new ET Fund <br />budget for 2024, however the actual quote came in above what was oirginally estimated. <br />The ET Fund was designed to absorb these types of variances between anticipated and <br />actual costs. <br />ATTACHMENTS: None <br />Page 1 of 2 <br />Information Technology "Study Session Staff Report", 1/22/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.