My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-2024 PW_CDS SS Briefings
>
Meetings
>
2024
>
10. October
>
2024-10-28 1:30 PM - Public Works and CDS Study Session
>
10-28-2024 PW_CDS SS Briefings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2024 8:39:23 AM
Creation date
10/25/2024 8:33:16 AM
Metadata
Fields
Template:
Meeting
Date
10/28/2024
Meeting title
Public Works and CDS Study Session
Location
BoCC Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed trail runs along the southern edge of Bowers Field. It is likely the <br /> construction of a trail within the airport boundary will require authorization from the FAA <br /> Area District Office. Approval is likely, give the location of the proposed trail and lack of <br /> airspace impact. <br /> The City of Ellensburg will be the applicant to the EPA. Total cost of the project is <br /> estimated to be in excess of$10 million. The grant does not require a local match. As <br /> property owner of the majority of the proposed reconnection route, the grant application <br /> would benefit from a letter of support. Road right-of-way may not be sufficient for the <br /> proposed trail width and the City would need to acquire additional easements. <br /> FISCAL IMPACT: <br /> Fiscal impacts are yet to be determined. <br /> ATTACHMENTS: <br /> Exhibit 1: Map of the Proposed Project Area <br />
The URL can be used to link to this page
Your browser does not support the video tag.