Laserfiche WebLink
As a non-project action, the proposal is not expected to cause environmental health hazards. The <br /> use of any hazardous materials on a project-by-project basis will be subject to federal and state <br /> law and the County Building Code(KCC Title 14). <br /> 1) Describe any known or possible contamination at the site from present or past uses.,-`.`."- <br /> Washington State Ecology maintains an online database of sites and facilities of environmental <br /> interest within Kittitas County. ht s: ortress.Wa.Q ov ec vLnet hborhaod These sites are <br /> generally located along interstate 90 and generally include: <br /> State Cleanup sites <br /> • Federal Superfund sites <br /> • Hazardous Waste Generators <br /> • Solid Waste facilities <br /> Underground Storage Tanks <br /> • Dairies <br /> Enforcement <br /> 2) Describe existing hazardous chemicalstconditions that might affect project development and <br /> design.This includes underground hazardous liquid and gas transmission pipelines located <br /> within the project area and in the vicinity.ftipj <br /> Washington Utilities and Transportation Commission identifies two primary pipeline routes <br /> within Kittitas County: <br /> • Northwest Pipeline LLC <br /> • Puget Sound Energy <br /> • https://wutc.maps.orcgis.com/home/webmap/viewer.html?webmap=O60d9e52b26a4 <br /> 40aMb1929e9050M <br /> As a non-project action,the proposal is not expected to cause environmental health hazards. <br /> The use of any hazardous materials on a project-by-project basis will be subject to federal and <br /> state law and the County Building Code(KCC Title 14). <br /> 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the <br /> project's development or construction, or at any time during the operating life of the project. <br /> hel <br /> As a non-project action,the proposal is not expected to cause environmental health hazards. <br /> The use of any hazardous materials on a project-by-project basis will be subject to federal and <br /> state law and the County Building Code(KCC Title 14). <br /> 4) Describe special emergency services that might be required. W <br /> No special emergency services are required for this non-project proposal. <br /> Page 12 of 26 <br /> sEPA Environmental checkilst MAc 197.11-9ro) <br /> - July2Di6 - <br />