My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-24-00003 Suncadia PH 2 Div 7 - BOCC Packet
>
Meetings
>
2024
>
10. October
>
2024-10-15 2:00 PM - 2:00pm Public Hearing
>
LP-24-00003 Suncadia PH 2 Div 7 - BOCC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2024 1:19:28 PM
Creation date
10/10/2024 1:18:05 PM
Metadata
Fields
Template:
Meeting
Date
10/15/2024
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to consider Suncadia Phase 2 Division 7 Preliminary Plat (LP-24-00003).
Order
1
Placement
2:00pm Public Hearing
Row ID
123186
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />7 <br /> <br />KCPW provided the following comments: <br /> <br />Please provide an inventory of equivalent residential units, or the accounting method utilized in the water <br />system plan, affirming sufficient capacity serving the plat. Please provide an inventory of equivalent <br />residential units, or the accounting method utilized in the general sewer plan, affirming sufficient capacity <br />serving the plat. Public works will reserve additional engineering comments for the Civil Public Review <br />process. No additional survey requirements as part of the preliminary long plat. For the final long plat, the <br />following will need to be included: Controlling corners will need to be shown. As a minimum, corners <br />between new division lines shall be set and shown on the face of the plat. Wanawish Loop shall be <br />identified as being a “Private 40’ Paved ROW.” <br /> <br />Staff Response: Applicant provided a response to KCPW’s comments. The applicant stated that <br />“Suncadia acknowledges the provided access, engineering, survey, transportation concurrency, flood, <br />water mitigation/metering, and airport comments and will address accordingly prior to the final plat <br />submission as requested.” Staff therefore states that Suncadia has adequately addressed the comments <br />submitted by KCPW. <br /> <br /> <br />Washington State Department of Health – Office of Drinking Water <br />WSDOH (Office of Drinking Water) submitted the following comments: <br /> <br />How does this application differ from a previous application entitled “Ph 2 Div 7” that identified 148 <br />homes? <br /> <br />Staff Response: Applicant provided a response to Washington State Department of Health (Office of <br />Drinking Water). The applicant stated that “Suncadia’s Phase 2 Division 7 final plat was approved a <br />couple of years ago. This plat is taking 14 platted lots in “Ph 2 Div 7” and sub-dividing into 24 total <br />platted lots (+10). Suncadia acknowledges that the current DOH approved water connection count would <br />be exceeded if all preliminary platted developments under review by the County received final plat. <br />Suncadia Resort is actively engaged with Suncadia Water Company’s update of the resort water facilities <br />capacity analysis model to allow for additional connections. As the utility service provider, Suncadia <br />Water Company is the lead in working with a water modeling consultant and the DOH. The accounting <br />method used for allowed connections is an antiquated method based on 20-year-old assumptions, not <br />actual water usage data. Suncadia Water Company has updated their water facilities capacity analysis <br />with actual usage data and has submitted that to DOH for review. This updated model is to facilitate <br />approval of updated and more accurate connection counts. Because the discussion on the update of the <br />water connection model between Suncadia Water Company and the DOH has not been concluded, <br />Suncadia proposes an alternative approach in keeping under the allowed 1,501 connections. Suncadia’s <br />Phase 1 Division 14 development received preliminary plat, but Suncadia will not be working toward <br />final plat for this development in 2024. If the number of water connections anticipated for the Phase 1 <br />Division 14 development were excluded from the total connection table, there are enough water <br />connections allowed for the final plat of Nelson Stream (10 additional units). Removing the 39 <br />connections earmarked or Phase 1 Division 14 from the capacity analysis and adding in the units for the <br />Suncadia Social plat (previously approved 42 units) and Nelson Stream Plat (10), calculates 16 allowed <br />connections remaining. In summary, if the Nelson Stream plat were approved before the Phase 1 Division <br />14 plat, there are enough water connections available for plat LP-24-00003. Suncadia will continue <br />coordination with Suncadia Water Company and the Department of Health on the updated capacity <br />analysis model. Suncadia appreciates DOH’s swift and thorough coordination, review, and approval of <br />the utility company’s applications for updated approved connections.” Staff therefore states that Suncadia <br />has adequately addressed the comments submitted by WSDOH – Office of Drinking Water. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.