Laserfiche WebLink
<br /> <br />4 <br /> <br />11. Civil Plans will be reviewed and approved as submitted prior to final plat approval in accordance with <br />the Development Agreement. <br /> <br />12. The applicant shall provide design calculations for treatment and disposal areas. If utilizing an <br />existing system, please provide an accounting affirming sufficient capacity. <br /> <br />13. Timing of Improvements: Per the Suncadia 2009 Development Agreement section 5.3 Infrastructure, <br />Surety Bonding or Other Assurances. Infrastructure identified by Trendwest in an approved Site <br />Development Plan must be provided and available for use before the issuance of the first certificate of <br />occupancy for Master Planned Resort Accommodation Units included with such plan. For purposes <br />of final plat approval or issuance of building permits, infrastructure may be guaranteed through surety <br />bonding or other financial assurance device acceptable to the County. The estimated costs of <br />providing all such guaranteed Infrastructure shall be reviewed and approved by the County Public <br />Works Director or designee. Surety bonding or other financial device provided to the County shall be <br />in an amount equal to at least 110% of such estimated costs as determined by Trendwest’s architects <br />and engineers. <br /> <br />Exhibit F-1 Suncadia MPR Conditions of Approval: <br /> <br />A-2 (a) Required Infrastructure and Utilities, as defined in the Development Agreement, shall <br />be installed and completed or bonded or other financial guaranties or accommodations made <br />for their completion prior to final plat approval of each subphase. <br /> <br />14. All Cultural resources shall be handled as identified in Exhibit F-1, C-21-23 of the Development <br />Agreement. <br /> <br />15. The applicant shall provide an inventory of equivalent residential units, or the accounting method <br />utilized in the water system plan, affirming sufficient capacity serving the plat. Applicant shall also <br />provide an inventory of equivalent residential units, or the accounting method utilized in the general <br />sewer plan, affirming sufficient capacity serving the plat. <br /> <br />16. Applicant shall provide survey corrections for the final long plat: Controlling corners will need to be <br />shown. As a minimum, corners between new division lines shall be set and shown on the face of the <br />plat. Wanawish Loop shall be identified as being a “Private 40” Paved ROW. <br /> <br />17. The applicant shall adhere to the conditions outlined in the Master Planned Resort conditions of <br />approval, specifically condition C-17 Monitoring Program. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />NOW, THEREFORE BE IT RESOLVED: That the Kittitas County Board of Commissioners hereby <br />grants preliminary plat approval to the Suncadia Phase 2 Division 7 Preliminary Plat (LP-24-00003) and <br />adopts the above Findings of Fact, Conclusions of Law, and Conditions of Approval and the same hereby