other rights or obligations of indemnity that would otherwise exist as to a parfy or person described in this Section
<br />3.18.
<br />S 3.1S.2 In claims against any person or entify indemnified under this Section 3.18 by an employee of the
<br />Contractor, a Subcontractor, anyone directly or indirectly employed by them or anyone for whose acts they may be
<br />liable, the indemnification obligation under Section 3.18.1 shall not be limited by a limitation on amount or type of
<br />damages, compensation or benefits payable by or for the Contractor or a Subcontractor urder workers'
<br />compensation acts, disability benefit acts or other employee benefit acts.
<br />ARTICLE 4 ARCHITECT
<br />s 4.1 GENERAL
<br />$ 4.1.1 The Owner shall retain an architect lawfully licensed to practice architecture or an entity lawfully practicing
<br />architecture in the jurisdiction where the Project is located. That person or entity is identified as the Architect in the
<br />Agreement and is referred to throughout the Contract Documents as if singular in number.
<br />$ 4.1.2 Duties, responsibilities and limitations of authoriry of the Architect as set forth in the Contract Documents
<br />shall not be restricted, modified or extended without written consent of the Owner, Contractor and Architect.
<br />Consent shall not be unreasonably withheld.
<br />S 4.1.3 If the employment of the Architect is terminated, the Owner shall employ a successor architect as to whom
<br />the Contractor has no reasonable objection and whose status under the Contract Documents shall be that of the
<br />Architect.
<br />$ 4.2 ADMTNTSTRATION OF THE CONTRACT
<br />$ 4,2.1 The Architect will provide administration of the Contract as described in the Contract Documents and will be
<br />an Owner's representative during construction until the date the Architect issues the final Certificate for Payment.
<br />The Architect will have authority to act on behalf of the Owner only to the extent provided in the Contract
<br />Documents.
<br />$ 4.2,2 The Architect will visit the site at intervals appropriate to the stage of construction, or as otherwise agreed
<br />with the Owner, to become generally familiar with the progress and quality of the portion of the Work completed,
<br />and to determine in general if the Work observed is being performed in a manner indicating that the Work, when
<br />fully completed, will be in accordance with the Contract Documents. However, the Architect will not be required to
<br />make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. The Architect will
<br />not have control over, charge of, or responsibility for, the construction means, methods, techniques, sequences or
<br />procedures, or for the safety precautions and programs in connection with the Work, since these are solely the
<br />Contractor's rights and responsibilities under the Contract Documents, except as provided in Section 3.3.1.
<br />$ 4.2.3 On the basis of the site visits, the Architect will keep the Owner reasonably informed about the progress and
<br />quality of the portion of the Work completed, and report to the Owner (l) known deviations from the Contract
<br />Documents and from the most recent construction schedule submitted by the Contractor, and (2) defects and
<br />deficiencies observed in the Work. The Architect will not be responsible for the Contractor's failure to perform the
<br />Work in accordance with the requirements of the Contract Documents. The Architect will not have control over or
<br />charge of and will not be responsible for acts or omissions of the Contractor, Subcontractors, or their agents or
<br />employees, or any other persons or entities performing portions of the Work.
<br />$ 4.2.4 COMMUNICATIoNS FACILITATING CONTRACT ADMINISTRATION
<br />Except as otherwise provided in the Contract Documents or when direct communications have been specially
<br />authorized, the Owner and Contractor shall endeavor to communicate with each other through the Architect about
<br />matters arising out of or relating to the Contract. Communications by and with the Architect's consultants shall be
<br />through the Architect. Communications by and with Subcontractors and material suppliers shall be through the
<br />Contractor. Communications by and with separate contractors shall be through the Owner.
<br />$ 4.2.5 Based on the Architect's evaluations of the Conhactor's Applications for Payment, the Architect will review
<br />and certify the amounts due the Contractor and will issue Certificates for Payment in such amounts.
<br />$ 4,2.6 The Architect has authority to reject Work that does not conform to the Contract Documents. Whenever the
<br />Architect considers it necessary or advisable, the Architect will have authority to require inspection or testing of the
<br />AIA Document A2O7 - 2OO'1. Copyrighr @ tgl.l., 1915, IgI8, L925, 193?, 1.951, L958, 196I, l-963, 1-966, 19'70, l9'76, 198?, L99"l and 2007. All
<br />rights reserved. '.The American Institute of Arehitects," "American InsliLute of A.chitects," *AIA," the AfA Logo, add "AIA Contract
<br />Documents" are erademarks of the American Institute of Architecis. This draft was Produced at 09:51:3? P'f o\ 05/13/2024 under order
<br />No.410424304? which expires o^ 06/IO/2024, is not for resaLe/ is licensed for one-time use onLy' aod may only be used in accordance wiLh
<br />the AfA Contract Docunentso Terns of Service. To.eport copyrighb violations, e-mail docinfoGaiacontracts.con.
<br />u56r Notes: lrl649r6oyll
<br />L7
|