My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHEET 1 OF 1 <br />TEST PIT NUMBER: <br />TP-25 (P) <br />PROJECT NUMBER: <br />684127CH.05.02 <br />TEST PIT LOGehnn <br />pRO.lFCT Kittitas Countv Transfer Stalion lctfirrc a^r'ntv lA/A I O(]AT|ON Flinfilt.r 1613O?4 O N 1617653 6 F) <br />trr F\/artoN. 1551 3 ft NAVD88 a:r)NTPAa:TnR' ll \/an flp \/entcr/Kiftitas Co <br />EXCAVATION EQUIPMENT: Hitachi Zaxis 'l35US Excavator w/ 30" bucket DATE EXCAVATED" 41912019 <br />APPROX.0'LOGGER: M. Kacmarcik <br />COMMFNTSAMPLESOIL DESCRIPTION <br />oJo <br />IA <br />to <br />DIFFICULTY IN EXCAVATION, <br />RUNNING GRAVEL CONDITION, <br />COLLAPSE OF WALLS, SAND HEAVE, <br />DEBRIS ENCOUNTERED, WATER <br />SEEPAGE GMDATIONAL CONTACTS, <br />TtrST INSTRI IMtrNTATION <br />FL <br />U <br />Itlo <br />rBFO <br />8H <br />E <br />J <br />E.ulFz <br />Uo. <br />F* <br />SOIL NAME, USCS GROUP SYMBOL. COLOR, <br />MOISTURE CONTENT, RELATIVE DENSIry OR <br />CONSISTENCY, SOIL STRUCTURE, MINERcLOGY <br />1.0 <br />1-BULK <br />sanuvsri-tv[i:El6iu-rtoauo-ve-wi-thGs-tim-atea-so7-rin;6m-ed'rufr - <br />GRAVEL (GW): brown, moist. <br />to 8 inch diameter <br />grey <br />sand. <br />2.t) <br />2.BULK <br />7-O <br />a a a <br />a a a <br />a a a <br />o a a <br />a a a <br />a a I <br />I a a <br />a a a <br />a a a <br />t a a <br />t a a <br />a a a <br />a a a <br />a I a <br />a a I <br />a a a <br />I I a <br />I a a <br />a a a <br />a a I <br />a t I <br />I I I <br />a a I <br />a a I <br />a I a <br />a a a <br />a a I <br />a I I <br />Begin TP excavation at 14:23. Ground surface is <br />grass pasture. Weather is clear and windy. <br />LABOMTORY: <br />w(%)=19.9 <br />LL=38%, PL=21o/o, Pl=17To <br />P200=M.Oo/o <br />Volcanic ash layer at 2.5' bgs, approx 2" thick <br />No sidewall sloughing in silt <br />LABORATORY: <br />P200=6.2% <br />Groundwater at 8.0' bgs. lnstall '1" diameter <br />Schedule 40 PVC piezometer in test pit with fleld <br />slotted screen from 8.0 to 9.0'bgs. <br />Backfill to ground surface with compacted <br />excavation spoils.Boftom of Boring at 1 1 .0 ft bgs on 4/9/20'19 <br />10 <br />A <br />15 <br />'l <br />6.0
The URL can be used to link to this page
Your browser does not support the video tag.