|
Sub-subcontractor, Defi nition of
<br />5.1.2
<br />Subsurface Conditions
<br />3.7.4
<br />Successors and Assigns
<br />13.2
<br />Superintendent
<br />3.9,10.2.6
<br />Supervision and Construction Procedures
<br />r.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1 .3, 6.2.4,
<br />7 .1.3, 7 .3.7, 8.2, 8.3.7, 9.4.2, 10, 12, 14, t 5.1.3
<br />Surety
<br />5.4.1 .2, 9.8.5, 9.1 0.2, 9. I 0.3, I 4.2.2, I 5.2.7
<br />Surety, Consent of
<br />9.10.2,9.10.3
<br />Surveys
<br />2.2.3
<br />Suspension by the Owner for Convenience
<br />14.3
<br />Suspension of the Work
<br />5.4.2,14.3
<br />Suspension or Termination of the Contract
<br />5.4.1.r,14
<br />Taxes
<br />3.6,3.8.2.1,7.3.7.4
<br />Termination by the Contractor
<br />14,1,15,1.6
<br />Termination by the Owner for Cause
<br />5.4.1.t,14.2,75.1.6
<br />Termination by the Owner for Convenience
<br />14.4
<br />Termination of the Architect
<br />4.r.3
<br />Termination of the Conhactor
<br />14.2.2
<br />TERMINATION OR SUSPENSION OF TIIE
<br />CONTRACT
<br />t4
<br />Tests and Inspections
<br />3.1 .3 , 3 .3 .3, 4.2.2, 4.2.6, 4.2.9,9.4.2, 9.8.3, 9.9 .2,
<br />9. 10. l, 10.3.2, ll.4.l, 12.2.1, 13.5
<br />TIME
<br />8
<br />Time, Delays and Extensions of
<br />3.2.4, 3 .7 .4, 5.2.3, 7 .2.1, 7 .3.1, 7 .4, 8.3, 9 .5 .1, 9.7,
<br />10.3.2, t0.4, 14.3.2, 15.1.5, 15.2.5
<br />Time Limits
<br />2.1 .2, 2.2, 2.4, 3.2.2, 3. I 0, 3. I l, 3.12.5, 3.1 5.1, 4.2,
<br />5.2, 5.3, 5.4, 6.2.4,7 .3,7 .4, 8.2, 9 .2, 9.3.1, 9 .3 .3,
<br />9.4.1,9.5,9.6,9.7,9.8, 9.9, 9.10, I r.1.3,12.2, 13,5,
<br />13.7 , 14, L5 .l .2, 15 .4
<br />Time Limits on Claims
<br />3.7 .4, 10.2.8, 13.7, 15.1.2
<br />Title to Work
<br />9.3.2,9.3.3
<br />Transmission of Data in Digital Form
<br />1.6
<br />UNCOVERING AND CORRECTION OF
<br />WORK
<br />t2
<br />Uncovering of Work
<br />12.1
<br />Unforeseen Conditions, Concealed or Unknown
<br />3.7.4,8.3.1, 10.3
<br />Unit Prices
<br />7.3.3.2,7.3.4
<br />Use of Documents
<br />1. 1. 1, 1.5, 2.2.5, 3.12.6, 5.3
<br />Use of Site
<br />3.13,6.1.1,6.2.1
<br />Values, Schedule of
<br />9.2,9.3.1
<br />Waiver of Claims by the Architect
<br />13.4.2
<br />Waiver of Claims by the Contractor
<br />9.10.5, 13.4.2,15.1.6
<br />Waiver of Claims by the Owner
<br />9.9.3, 9.10.3, 9.10.4, 12.2.2.1, 13.4.2, 14.2.4,15.1.6
<br />Waiver of Consequential Damages
<br />14.2.4, ts.l.6
<br />Waiver of Liens
<br />9.10.2,9.10.4
<br />Waivers of Subrogation
<br />6.t.1,11.3.7
<br />Warranty
<br />3.5, 4.2.9, 9 .3.3, 9.8.4, 9.9.1, 9 .10.4, 12.2.2, 13.7
<br />Weather Delays
<br />t5.l.5.2
<br />Work, Definition of
<br />1.1.3
<br />Written Consent
<br />1.5.2, 3.4.2, 3,7 .4, 3.12.8, 3 .l 4.2, 4.1.2, 9.3 .2, 9.8.5,
<br />9.9.1, 9.10.2, 9. 10.3, 1 1.4. l, 13.2, 13.4.2, 15.4.4.2
<br />Written Interpretations
<br />4.2.t1,4.2.12
<br />Written Notice
<br />2.3, 2.4, 3.3.1, 3.9, 3.12.9, 3 .12.10, 5.2.1, 8.2.2, 9.7,
<br />9.10, 10.2.2, I 0.3, 1 I . I .3, 12.2.2, 12.2.4, 13.3, I 4,
<br />15.4.1
<br />Written Orders
<br />l.l.L, 2.3, 3.9, 7, 8.2.2, 12.1, 12.2, 13.5.2, 14.3.1,
<br />15.1.2
<br />AIA Document A2gL - 2007, Copyrisht @ 1911, 1915, 1918, 1925, 193?, 1951, 1958, 796L, Lgfi, f966, l9'70, l9'16, 198'l' 19
<br />righCs resetved. "The Anerican InstiLuLe of Alchitects," "American Institute of Architects," "AIA," the AIA Logo' and
<br />Doiuments,, are ttadenarks of The Anerican Institute of Alchitect.s. This draft was produced at 09:51:3? Pl or 05/13/202
<br />nlo.4L0424304'l which expires on 06/IO/2024, is not for resaLe, is Iicensed for one-time use only' and may only be used
<br />the AIA Contract Documentso Terns of Service. To repolt copyright violations, e-mail docinfocaiacontracts.com.
<br />Uger Notes:
<br />97 and 2007. AIl
<br />"AIA Contract
<br />4 unde. order
<br />i.n accordance with
<br />8
<br />(r.1549r501?)
|