Laserfiche WebLink
Sub-subcontractor, Defi nition of <br />5.1.2 <br />Subsurface Conditions <br />3.7.4 <br />Successors and Assigns <br />13.2 <br />Superintendent <br />3.9,10.2.6 <br />Supervision and Construction Procedures <br />r.2.2, 3.3, 3.4, 3.12.10, 4.2.2, 4.2.7, 6.1 .3, 6.2.4, <br />7 .1.3, 7 .3.7, 8.2, 8.3.7, 9.4.2, 10, 12, 14, t 5.1.3 <br />Surety <br />5.4.1 .2, 9.8.5, 9.1 0.2, 9. I 0.3, I 4.2.2, I 5.2.7 <br />Surety, Consent of <br />9.10.2,9.10.3 <br />Surveys <br />2.2.3 <br />Suspension by the Owner for Convenience <br />14.3 <br />Suspension of the Work <br />5.4.2,14.3 <br />Suspension or Termination of the Contract <br />5.4.1.r,14 <br />Taxes <br />3.6,3.8.2.1,7.3.7.4 <br />Termination by the Contractor <br />14,1,15,1.6 <br />Termination by the Owner for Cause <br />5.4.1.t,14.2,75.1.6 <br />Termination by the Owner for Convenience <br />14.4 <br />Termination of the Architect <br />4.r.3 <br />Termination of the Conhactor <br />14.2.2 <br />TERMINATION OR SUSPENSION OF TIIE <br />CONTRACT <br />t4 <br />Tests and Inspections <br />3.1 .3 , 3 .3 .3, 4.2.2, 4.2.6, 4.2.9,9.4.2, 9.8.3, 9.9 .2, <br />9. 10. l, 10.3.2, ll.4.l, 12.2.1, 13.5 <br />TIME <br />8 <br />Time, Delays and Extensions of <br />3.2.4, 3 .7 .4, 5.2.3, 7 .2.1, 7 .3.1, 7 .4, 8.3, 9 .5 .1, 9.7, <br />10.3.2, t0.4, 14.3.2, 15.1.5, 15.2.5 <br />Time Limits <br />2.1 .2, 2.2, 2.4, 3.2.2, 3. I 0, 3. I l, 3.12.5, 3.1 5.1, 4.2, <br />5.2, 5.3, 5.4, 6.2.4,7 .3,7 .4, 8.2, 9 .2, 9.3.1, 9 .3 .3, <br />9.4.1,9.5,9.6,9.7,9.8, 9.9, 9.10, I r.1.3,12.2, 13,5, <br />13.7 , 14, L5 .l .2, 15 .4 <br />Time Limits on Claims <br />3.7 .4, 10.2.8, 13.7, 15.1.2 <br />Title to Work <br />9.3.2,9.3.3 <br />Transmission of Data in Digital Form <br />1.6 <br />UNCOVERING AND CORRECTION OF <br />WORK <br />t2 <br />Uncovering of Work <br />12.1 <br />Unforeseen Conditions, Concealed or Unknown <br />3.7.4,8.3.1, 10.3 <br />Unit Prices <br />7.3.3.2,7.3.4 <br />Use of Documents <br />1. 1. 1, 1.5, 2.2.5, 3.12.6, 5.3 <br />Use of Site <br />3.13,6.1.1,6.2.1 <br />Values, Schedule of <br />9.2,9.3.1 <br />Waiver of Claims by the Architect <br />13.4.2 <br />Waiver of Claims by the Contractor <br />9.10.5, 13.4.2,15.1.6 <br />Waiver of Claims by the Owner <br />9.9.3, 9.10.3, 9.10.4, 12.2.2.1, 13.4.2, 14.2.4,15.1.6 <br />Waiver of Consequential Damages <br />14.2.4, ts.l.6 <br />Waiver of Liens <br />9.10.2,9.10.4 <br />Waivers of Subrogation <br />6.t.1,11.3.7 <br />Warranty <br />3.5, 4.2.9, 9 .3.3, 9.8.4, 9.9.1, 9 .10.4, 12.2.2, 13.7 <br />Weather Delays <br />t5.l.5.2 <br />Work, Definition of <br />1.1.3 <br />Written Consent <br />1.5.2, 3.4.2, 3,7 .4, 3.12.8, 3 .l 4.2, 4.1.2, 9.3 .2, 9.8.5, <br />9.9.1, 9.10.2, 9. 10.3, 1 1.4. l, 13.2, 13.4.2, 15.4.4.2 <br />Written Interpretations <br />4.2.t1,4.2.12 <br />Written Notice <br />2.3, 2.4, 3.3.1, 3.9, 3.12.9, 3 .12.10, 5.2.1, 8.2.2, 9.7, <br />9.10, 10.2.2, I 0.3, 1 I . I .3, 12.2.2, 12.2.4, 13.3, I 4, <br />15.4.1 <br />Written Orders <br />l.l.L, 2.3, 3.9, 7, 8.2.2, 12.1, 12.2, 13.5.2, 14.3.1, <br />15.1.2 <br />AIA Document A2gL - 2007, Copyrisht @ 1911, 1915, 1918, 1925, 193?, 1951, 1958, 796L, Lgfi, f966, l9'70, l9'16, 198'l' 19 <br />righCs resetved. "The Anerican InstiLuLe of Alchitects," "American Institute of Architects," "AIA," the AIA Logo' and <br />Doiuments,, are ttadenarks of The Anerican Institute of Alchitect.s. This draft was produced at 09:51:3? Pl or 05/13/202 <br />nlo.4L0424304'l which expires on 06/IO/2024, is not for resaLe, is Iicensed for one-time use only' and may only be used <br />the AIA Contract Documentso Terns of Service. To repolt copyright violations, e-mail docinfocaiacontracts.com. <br />Uger Notes: <br />97 and 2007. AIl <br />"AIA Contract <br />4 unde. order <br />i.n accordance with <br />8 <br />(r.1549r501?)