My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHEET 1 OF 1 <br />TEST PIT NUMBER: <br />TP-l0 (P) <br />PROJECT NUMBER: <br />684',127CH.05.02 <br />TEST PIT LOGehZwt <br />PROJECT: Kittitas Countv Station. Kittitas Counlv. WA LOCA Transfer Buildino (613659.7 N. 1618241.5 E) <br />FI F\/ATION. 1551 q ft NAVD88 CoNTFIACTOR'C Van De Venter/Kittitas Co- <br />EXCAVATTON EeUtpMENT: Hitachi Zaxis 135US Excavator W 30" bucket DATE EXCAVATED:411012O19 <br />DIMENSIONS: 3'wide M. Kacmarcik <br />cr)irnrtrNTSAMPLESOIL DESCRIPTION <br />(,oJIr <br />0- <br />t(1 <br />DIFFICULTY IN EXCAVATION, <br />RUNNING GRAVEL CONDITION, <br />COLLAPSE OF WALLS, SAND HEAVE, <br />DEBRIS ENCOUNTERED, WATER <br />SEEPAGE GMDATIONAL CONTACTS, <br />TtrqT INqTPII['trNTATIAN <br />trLEI;h voilii<o6& <br />la <br />€) <br />t <br />LIJFz <br />Uo. <br />E <br />SOIL NAME, USCS GROUP SYMBOL, COLOR, <br />MOISTURE CONTENT, RELATIVE DENSITY OR <br />CONSISTENCY, SOIL STRUCTURE, MINERALOGY <br />2.0 <br />1-BULF <br />3.0 <br />Sandy SILT (MH): greyish brown wrth orange ano grey motulng, molsl. <br />6.5 <br />2-BULh <br />7.5 <br />9.0 <br />3.BULK <br />t <br />Begin TP excavation at 08:37. Ground surface is <br />grass pasture. Weather is clear, light wind. <br />LABORATORY: <br />w(%)=32.5 <br />LL=52%, P L=21 o/o, P l= 1 1 % <br />TORVANE = 2.0 lo 2.2 kg/cm^2 <br />Ash layer visible in TP sidewall <br />Color change to vivid moftled bright orange and- <br />grey <br />Gravel and groundwater at 7.5'. Test pit sidewalls <br />cave readily below 7.5' <br />lnstall 1" diameter Schedule 40 PVC piezometer <br />with field slotted screen from 8.5 to 9.5' bgs. <br />LABORATORY: <br />P200=13.0% <br />Well-Graded Cobbley GMVEL with SILT (GW-GM): brown, wet, <br />rounded. Sizes up to 6" diameter. <br />Backfill to ground surface with compacted <br />excavation spoils.Bottom of Boring at 12.Oft bgs on 4/10/2019 <br />10 <br />'15 <br />5 <br />10.0
The URL can be used to link to this page
Your browser does not support the video tag.