My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NUMBER: <br />684127CH.05.02 <br />TEST PIT NUMBER: <br />TP-01 (P)SHEET 1 OF 1 <br />TEST PIT LOGehtn* <br />PRO-IFCT' Kiltites Countv Transfer Station l(ilrirra a^' 'hlv l/\rA I n(:ATI.lN' l /aet Fhfran.e l6'1M92 I N 16'1719L ) <br />trI FVATION' 154R 1 fI NAVD88 f: \/rn De \/entar/Kitlit* e6 <br />EXCAVATION EQUIPMENT: Hitachi Zaxis 1 35US Excavator w/ 30" bucket DATE EXCAVATED: 41912019 <br />APPROX. DIMENSIONS: 3'LOGGER: M. Kacmarcik <br />(:OMMtrNTSAMPLESOIL DESCRIPTION <br />oJ <br />i <br />0- <br />Eo <br />DIFFICULTY IN EXCAVATION, <br />RUNNING GMVEL CONDITION, <br />COLLAPSE OF WALLS, SAND HEAVE, <br />DEBRIS ENCOUNTERED, WATER <br />SEEPAGE GRADATIOML CONTACTS, <br />TtrET INSTPIIN/ltrNTATIr)N <br />FL <br />Uo(tf,a <br />-if,qu;ioE <br />C <br />J <br />E. <br />UJF <br />= <br />U <br />0- <br />Ir <br />SOIL NAME, USCS GROUP SYMBOL, COLOR, <br />MOISTURE CONTENT, RELATIVE DENSITY OR <br />CONSISTENCY, SOIL STRUCTURE, MINERALOGY <br />1.0 <br />1-BULI <br />z.u <br />4.0 <br />2.BUL},( <br />Much sidewall sloughing in gravels below 3 feet. <br />Excavation becomes more difficult below 6 feet. <br />Becomes coarser and more well-graded with <br />depth. <br />Becomes wet at 11 feet bgs. Water visibly <br />flowing into pit. <br />;l <br />1l <br />l' <br />a <br />I <br />I <br />a <br />I <br />sirty-sn-N6-riiintnnvet--tsMl-*low-i,?disra-pp-roisT"Z''fr slicsiif - <br /><10% rounded gravel. Some grey mottling. Root fibers to 3 feet. <br />-w?irGEa?atnnve-r-Gwl-n6fr ir,ffi ;t.-oaveGrg-'iFttrinauoG,- <br />max size 12" diameter, and mixed lithology. <br />Gravels are mixed lithology. <br />diameter <br />lnstall 1 inch diameter Schedule 40 PVC <br />piezometer with field-slotted 1'screen in backwall <br />bf test pit. Pipe is 10' long. Backfill test pit to <br />ground surface with compacted excavation <br />spoils. <br />Bottom of Boring at 13.5 ft bgs on 419120'19 <br />5 <br />15 <br />10_ <br />5.0
The URL can be used to link to this page
Your browser does not support the video tag.