My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRILLING COMPANY: Holt Services, lnc. <br />DRILLING METHOD: Hollow Stem Auger, Mobile Drill 857 Track Rig. <br />SAMPLING METHOD: SPT w/ Autohammer <br />LOCATION: See Figure 2. <br />DATESTARTED: 31112023 <br />DATE COMPLETED: 31 1 12O23 <br />LOGGED BY: V. Oskierko <br />aoIo <br />J <br />6ao <br />a <br />t <br />uJ.., dtt=>JlzuJ u.JJJ(L(L <br />oa <br />m"' <br />Oil7a a F <br />EE E *es x 1t2 = ailr: F EE9 o o o 10 <br />Standard Penetration Test <br />(140 lb. weight, 30" drop) <br />A Blows per foot <br />zo <br />F <br />uJJ <br />uJ <br />IF(L <br />ulo <br />0 <br />oo <br />Jodt <br />a DESCRIPTION 20 30 40 50 <br />oo <br />2-2-2 <br />m <br />I <br />m <br />m <br />m <br />m <br />s-2 1-1-2 <br />5 s-3 DD <br />AL <br />o/oF <br />s-4 11-36-24 <br />g <br />10 s-5 7-25-38 <br />s-6 6-19-30 <br />15 s-7 10-45-45 GS <br />20 s-8 28-3$50i3', <br />Exploration terminated al21,2Sleel below ground surface <br />(BGS). Groundwater was enmuntered at I' BGS. Borehole <br />abandoned with 3/8" bentonite chips. <br />A bulk sample of drill cuttings was taken wtrile drilling from <br />approximately 0'-5' BGS. <br />25 0 20 40 60 80 <br />Water Content (o/o) <br />PlasticLimit |---H LiquidLimit <br />Natural Water Content <br />100 <br />NOTE: This log of subsurface conditions applies only at the specified location and on the date indicated <br />and thdrefore may not necessarily be indicalive of other times and/or locations. <br />OL Medium stiff, dark brown, organic SILT, with roots, moist. <br />No recovery. Description based on drill cuttings. <br />(TOPSOIL) <br />CL <br />Drilling becomes rough. <br />Very dense, brown, slightly silty, gravelly, poorly graded <br />SAND, moist. <br />Gravel broken by sampler. <br />(COARSE.GRAINED ALLUVIUM) <br />rSgvc!7.5'-1o',BGS. <br />Very dense, brown, slightly silty, very gravelly, poorly graded <br />SAND. <br />Dense, bluish gray, fine gravelly, silty SAND, wet. <br />Very dense, bluish gray, very gravelly, silty SAND, wet. <br />Very rough drilling from 15'-18' BGS. <br />No recovery. Sampler crme up wet. <br />CL <br />SP <br />SM <br />SP <br />SM <br />::[. <br />I <br />.[. <br />SM <br />SM <br />T <br />Kittitas County Transfer Station <br />Geotechnical I nvestigation <br />Ellensburg, Washington <br />BORING <br />BH.2 <br />PAGE: 1 of 1 <br />GEOSCIENCES INC. ercrecruo, 2022-188 <br />BORTNG-DSM 2022-'|88.GPJ 511 1123
The URL can be used to link to this page
Your browser does not support the video tag.