Laserfiche WebLink
Contractor's Construction Schedules <br />3.10,3 .12.1, 3.12.2, 6.1.3, 15 .l .5.2 <br />Contractor's Employees <br />3.3.2,3.4.3,3.8.1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10,2, 10.3, <br />1 l. l. 1, 11.3.7, 14.1, 14.2.1.1 <br />Contractor's Liability Insurance <br />11.1 <br />Contractor's Relationship with Separate Contractors <br />and Owner's Forces <br />3.12.5, 3.1 4.2, 4.2.4, 6, 11.3.7, 12.1.2, 12.2.4 <br />Contractor's Relationship with Subcontractors <br />1.2.2, 3.3.2, 3. 1 8. l, 3.18.2, 5, 9.6.2, 9 .6.7, 9 . 10.2, <br />11.3.1.2, 1 1.3.7, I 1.3.8 <br />Contractor's Relationship with the Architect <br />I .1,.2, | .5, 3. 1.3, 3.2.2, 3.2.3, 3 .2.4, 3 .3.1, 3 .4.2, 3.5, <br />3.7 .4, 3.r0, 3.LL, 3.12, 3. I 6, 3. I 8, 4.1.3, 4.2, 5.2, <br />6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, <br />10.3, 11.3.7, 12, 13.5, 15.1.2, 15.2.1 <br />Contractor's Representations <br />3 .2.1, 3.2.2, 3.5, 3.12.6, 6.2.2, 8.2.1, 9 .3 .3, 9.8.2 <br />Contractor's Responsibility for Those Performing the <br />Work <br />3.3.2, 3.18, 5.3, 6.1.3, 6.2, 9.5.1, 10.2.8 <br />Contractor's Review of Contract Documents <br />3.2 <br />Contractor's Right to Stop the Work <br />9.7 <br />Contractor's Right to Terminate the Contract <br />14.1, 15.1.6 <br />Contractor's Submittals <br />3. I 0, 3. I l, 3.12.4, 4.2.7, 5.2.1, 5.2.3, 9.2, 9.3, 9.8.2, <br />9.8.3, 9.9.1, 9.10.2, 9. 10.3, 11.1.3, 11.4.2 <br />Contractor's Superintendent <br />3.9, 10.2.6 <br />Contractor's Supervision and Conskuction <br />Procedures <br />1.2.2,3.3,3.4,3.12.10, 4.2.2, 4.2.7 , 6.1.3, 6.2.4, <br />7.1.3, 7 .3.5, 7 .3.7, 8.2, 10, 12, 14, I 5. 1.3 <br />Contractual Liability Insurance <br />11.1.1.8, 11.2 <br />Coordination and Correlation <br />7.2, 3.2.1, 3.3.1, 3. 10, 3.12.6, 6.1.3, 6.2.1 <br />Copies Furnished of Drawings and Specifications <br />1.5,2.2.5, 3 .11 <br />Copyrights <br />1.5,3.17 <br />Correction of Work <br />2.3, 2.4, 3.7 .3, 9.4.2, 9.8.2, 9.8.3, 9.9.1, 12.1.2, 12.2 <br />Correlation and Intent of the Contract Documents <br />1.2 <br />Cost, Definition of <br />7.3.7 <br />Costs <br />2.4, 3 .2.4, 3.7 .3, 3.8.2, 3.1 5.2, 5.4.2, 6. | .1, 6.2.3, <br />7 .3 .3.3, 7 .3 .7, 7 .3 .8, 7 .3 .9, 9.10.2, 10.3 .2, I 0.3. 6, <br />|1.3, 12.1.2, 12.2.r, 12.2.4, 13.5, 14 <br />Cutting and Patching <br />3.14,6.2.5 <br />Damage to Construction of Owner or Separate <br />Contractors <br />3.14.2, 6.2.4, 10.2.1.2, 10.2.5, 10.4, 1 1.1.1, I 1.3, <br />12.2.4 <br />Damage to the Work <br />3.1 4.2, 9.9 .r, 10.2.1.2, 10.2.5, 10.4, | | .3.1, 12.2.4 <br />Damages, Claims for <br />3.2.4, 3.18, 6. 1. l, 8.3.3, 9.5.1, 9.6.7, I 0.3.3, 1 l. l. 1, <br />I 1.3.5, 11.3.7, 14.1.3, 14.2.4, 15.1.6 <br />Damages for Delay <br />6.1.1, 8.3.3, 9.5.1.6, 9;7,10.3.2 <br />Date of Commencement of the Work, Definition of <br />8.1.2 <br />Date of Substantial Completion, Definition of <br />8.r.3 <br />Day, Definition of <br />8.1.4 <br />Decisions of the Architect <br />3.7 .4, 4.2.6, 4.2.7, 4.2.1 l, 4.2.12, 4.2.13, I 5.2, 6.3, <br />7 .3.7, 7 .3.9, 8. 1.3, 8.3. l, 9.2, 9.4, 9.5.1, 9.8.4, 9.9.1, <br />13.5.2, 14.2.2, 14.2.4, 15.1, 75 .2 <br />Decisions to Withhold Certification <br />9.4.1, 9.5, 9.7, 14.1.1.3 <br />Defective or Nonconforming Work, Acceptance, <br />Rejection and Correction of <br />2.3, 2,4, 3.5, 4.2.6, 6.2.5, 9.5.1, 9.5 .2, 9.6.6, 9 .8,2, <br />9.9.3,9.10.4,12.2.1 <br />Definitions <br />Ll, 2.1.1, 3. l. l, 3.5, 3.12.1, 3.12.2, 3.12.3, 4.1.1, <br />1 5. l. l, 5.1, 6.1.2,'7 .2.1, 7 .3.1, 8. l, 9. 1, 9.8. I <br />Delays and Extensions of Time <br />3.2, 3.7 .4, 5.2.3, 7 .2.1, 7 .3.1, 7 .4, 8.3, 9.5. l, 9.7, <br />10.3.2, 10.4, 14.3.2, I 5. 1.5, I 5.2.5 <br />Disputes <br />6.3,7 .3.9, 15 .1, 15 .2 <br />Documents and Samples at the Site <br />3.11 <br />Drawings, Definition of <br />1.1.5 <br />Drawings and Specifications, Use and Ownership of <br />3.11 <br />Effective Date of Insurance <br />8.2.2, tl.L.2 <br />Emergencies <br />10,4,14.1.1.2, 15.1.4 <br />Employees, Contractor's <br />3.3.2, 3.4.3, 3.8. 1, 3.9, 3.18.2, 4.2.3, 4.2.6, 10.2, <br />10.3.3, 1 1.1.1, 11.3.7, 14.1, 14.2.1.1 <br />Equipment, Labor, Materials or <br />l. 1.3, l. 1.6, 3.4, 3.5, 3.8.2, 3.8.3, 3.12, 3.13, 3. 1 5. 1, <br />4.2.6, 4.2.7, 5.2.1, 6.2.1, J .3.7, 9 .3 .2, 9. 3.3, 9.5. 1.3, <br />9.10.2, 10.2.1, 10.2.4, 14.2.1.1, 14.2.1.2 <br />Execution and Progress of the Work <br />1.1.3, I .2.1, I .2.2,2.2.3,2.2.5, 3.1, 3.3.1,3.4.1,3 .5, <br />3.7. 1, 3. 10. l, 3.12, 3.14, 4.2, 6.2.2, 7 .1.3, 7.3.5, 8.2, <br />9.5.1, 9.9.1, 10.2, 10.3, 12.2, 14.2, 14.3. l, I 5. 1.3 <br />AIA Docunent p.2OI - 2OO'1, Copyright O 191.1, 1915, 79L8, 1925, 193'1, L951, f958' I96L, 1963' 1'966, 1910, I9'16' 79 <br />ri.ghts reserved. .'The American Institute of Architects," "Ane!ican Institute of Architects," "AIA"'the AIA Logo <br />Do;uments', are trademarks of The l\melican Institute of Architects. this draft was Produced at 09151137 PT on 05/ <br />No.4lO424304? which expires on 06/10/2024r is not for resaLe, is Licensed for one-ti'me use only, and may only be <br />the AIA Contract Docunentso Telns of Service. To report copyright violations. e-nail docinfooai"acontracts.com. <br />User NoCes: <br />8'7, 199'l and 2007. All <br />, and "AIA contract <br />13/2024 under order <br />used in accordance with <br />(1154916017) <br />4