My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Finalized Contract Agreement Packet
>
Meetings
>
2024
>
09. September
>
2024-09-03 10:00 AM - Commissioners' Agenda
>
Finalized Contract Agreement Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 12:50:20 PM
Creation date
10/8/2024 12:48:44 PM
Metadata
Fields
Template:
Meeting
Date
9/3/2024
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Contract with Belsaas & Smith Construction for the Lower Valley Transfer Station
Order
11
Placement
Consent Agenda
Row ID
121755
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S A.3.2.3 Automobile Liability Automobile Liability covering vehicles owned, and non-owned vehicles used, by the <br />Contractor, withpolicy limits of not less than $1"000.000 per accident, for bodily injury, death of any person, and property <br />damage arising out of the ownership, maintenance and use of those motor vehicles along with any other statutorily required <br />automobile coverage. <br />S A.3,2.4 The Contractor may achieve the required limits and coverage for Commercial General Liability and <br />Automobile Liability through a combination of primary and excess or umbrella liability insurance, provided such <br />primary and excess or umbrella insurance policies result in the same or greater coverage as the coverages required under <br />Section A3 .2.2 and, A.3.2.3, and in no event shall any excess or umbrella liability insurance provide narrower coverage <br />than the primary policy. The excess policy shall not require the exhaustion of the underlying limits only through the <br />actual payment by the underlying insurers. <br />S A,3,2,5 Workers' Compensation at statutory limits. <br />S A.3.2.6 Employers' Liability with policy limits not less than $1.000.000 each accident, $1.000.000 each employee, <br />and $1,000,000 policy limit. <br />S A.3.2.7 Not Required <br />S A.3,2.8 If the Contractor is required to furnish professional services as part of the Work, the Contractor shall procure <br />Professional Liability insurance covering performance of the professional services, with policy limits of not less than <br />$1.000"000 per claim and_$2,1009@ in the aggregate. <br />S A.3.2.9 Not Required <br />S A.3,2.10 Not Required <br />S 4.3,2,11 Not Required <br />S A.3.2.12 Not Required <br />$ A,3.3 Conhactor's Other lnsurance Coverage <br />S 4.3.3.1 Not Required <br />S A.3.3.2 Not Required <br />S A.3.4 Performance Bond and Payment Bond <br />The Contractor shall provide surety bonds, from a company or companies lawfully authorized to issue surety bonds in <br />the jurisdiction where the Project is located, as follows: <br />Type Penal Sun ($) <br />Payment Bond <br />Performance Bond <br />100% ofthe Contract Sum <br />100% ofthe Contract Sum <br />Payment and Performance Bonds shall be AIA Document A3l2rM, Payment Bond and Performance Bond, or contain <br />provisions identical to AIA Document A3l2'rM, current as of the date of this Agreement. <br />ARTICLE A.4 SPECIAL TERMS AND CONDITIONS <br />Special terms and conditions that modi$ this Insurance and Bonds Exhibit, if any, are as follows: Not Required. <br />Copyright All arghts reseFved. 'i .ii: 1'..trtr.:!ti.. :i li:i,:!i!;!{: rrl <br />4
The URL can be used to link to this page
Your browser does not support the video tag.